A Work Breakdown Structure (WBS) is a hierarchical decomposition of a project into smaller, more manageable components.
The main purpose of a WBS is to provide a visual representation of the project's deliverables, tasks, and sub-tasks, allowing for better understanding, planning, and control of the project. It breaks down the project into smaller work packages, providing a clear framework for assigning responsibilities, estimating costs and durations, and tracking progress.
To design a Work Breakdown Structure (WBS) for the Student Portal Website project with cost estimation, I'll use the given information and provide a hierarchical breakdown of the project components.
Here's a proposed WBS coding based on the provided components and budget allocation:
Level 1 Components (Budget Allocation: RM 300,000)
Project Management (10%)
Design and Development (40%)
Content Management System (CMS) Integration (30%)
Testing and Quality Assurance (20%)
Level 2 Components
Project Management (Budget Allocation: RM 30,000)
1.1 Project Planning and Coordination
1.2 Resource Management
1.3 Stakeholder Communication
Design and Development (Budget Allocation: RM 120,000)
2.1 User Interface Design
2.2 Front-end Development
2.3 Back-end Development
2.4 Database Design and Implementation
Content Management System (CMS) Integration (Budget Allocation: RM 90,000)
3.1 CMS Selection and Configuration
3.2 Content Migration
3.3 User Training and Documentation
Testing and Quality Assurance (Budget Allocation: RM 60,000)
4.1 Test Planning and Execution
4.2 Bug Tracking and Resolution
4.3 Performance and Security Testing
Level 3 Components
User Interface Design (Budget Allocation: RM 30,000)
1.1 Wireframe Creation
1.2 Visual Design
1.3 User Experience (UX) Design
Front-end Development (Budget Allocation: RM 60,000)
2.1 HTML/CSS Coding
2.2 JavaScript Development
2.3 Responsive Design Implementation
Back-end Development (Budget Allocation: RM 60,000)
3.1 Server Setup and Configuration
3.2 Database Connectivity
3.3 Server-side Scripting
Database Design and Implementation (Budget Allocation: RM 60,000)
4.1 Database Schema Design
4.2 Tables and Relationships Creation
4.3 Data Import and Validation
For more details regarding Work Breakdown Structure, visit:
https://brainly.com/question/30455319
#SPJ4
1. Pneumatic systems are considered energy efficient.
True or false?
2. If heat is applied to the gas inside a receiver and the pressure remains constant, then the volume of the gas inside the receiver increases.
true or False?
True.Pneumatic systems are considered energy-efficient, and they use air to transmit energy instead of electricity. If heat is applied to the gas inside a receiver and the pressure remains constant, then the volume of the gas inside the receiver increases is a false statement.
Pneumatic systems are considered energy-efficient because they use air to transmit energy instead of electricity, which is more expensive to produce.
In addition, pneumatic systems are environmentally friendly because they do not produce any harmful emissions that could harm the environment.
According to Charles' Law, if the pressure of a gas is held constant, the volume of the gas will change proportionally with the temperature.
When heat is applied to a gas inside a receiver, the pressure of the gas increases, not remains constant. As a result, the volume of the gas inside the receiver decreases.
Pneumatic systems are considered energy-efficient, and they use air to transmit energy instead of electricity. They are also environmentally friendly because they do not produce any harmful emissions that could harm the environment. If heat is applied to the gas inside a receiver and the pressure remains constant, then the volume of the gas inside the receiver increases is a false statement. When heat is applied to a gas inside a receiver, the pressure of the gas increases, not remains constant, and the volume of the gas inside the receiver decreases.
To know more about Charles' Law visit:
brainly.com/question/12835309
#SPJ11
High humidity and wet weather can cause an increase in electrical ____ over a telephone system.a. compression b. attenuation c. jitterd. crosstalk
Answer:
B. attenuation
Explanation:
Attenuation is when your signal is lost or reduced as it travels from the transmitter to the receiver. Moisture is typically conductive, so it will cause a signal to be redirected, and the further the signal has to travel, the more attenuation (loss). The best path for the signal is a direct path from point A to point B, but conductive elements cause signals to "lose strength" because they take a different path before eventually reaching the destination.
Moisture is also a required component for corrosion, which is devastating to communication components, and another reason for signal attenuation.
The one end of a hollow square bar whose side is 0. 1 in with 0. 01 in thickness is under a tensile stress 102,500 psi and the other end is connected with a U bracket using a pin. Find the minimum diameter of pin is used. Take σ_all=243 ksi for pin material
The minimum diameter of the pin is 0.037 inches.
B. The first step in determining the minimum diameter of the pin is to calculate the maximum allowable stress for the pin material, which is given as 243 ksi.
Next, the load on the pin needs to be determined. Since one end of the bar is under a tensile stress of 102,500 psi, this load will be transferred through the pin to the U bracket.
To find the minimum diameter, we need to calculate the area of the pin using the formula A = P / σ_all, where P is the load and A is the area.
The area A can be calculated as P/σ_all = (102,500 psi) / (243 ksi) = 0.042 in^2. Finally, the minimum diameter of the pin can be calculated as d = √(4A/π) = 0.037 inches.
For more questions like Diameter click the link below:
https://brainly.com/question/13624974
#SPJ4
Which of the following materials are examples of ceramics?
A
fiberglass, carbon fiber, and Kevlar
B
cedar, mahogany, and bamboo
C
brick, glass, and porcelain
D
nylon, leather, and asbestos
Answer:
c
Explanation:
A are types of fiberous materials
B is woods
c ceramics
D unrelated materials
What is the formula for Measurement System Subject.
Answer:
You can see there are four different types of measurement scales (nominal, ordinal, interval and ratio).
Some Important Formulas:
Area of the rectangle, A = L \times B.Area of the square, A =Side ^2.Perimeter of a rectangle, P = 2 \times ( L+B )Perimeter of square, P = 4 \times Side.Area of the triangle, A = \frac{1}{2} \times Base \times Height.Circumference of a Circle, C = 2 \times \pi \times r.Hope this helps!
Don't forget to mark me as Brainliest.
# Structure Mechanics.
Draw the internal force (axial force, shear force and moment) diagrams of the frame.
A serial cable with an RJ-45 connector is capable of being used through an RJ-45 ethernet port.
A. True
B. False
The statement "A serial cable with an RJ-45 connector is capable of being used through an RJ-45 Ethernet port" is False.
A serial cable with an RJ-45 connector and an RJ-45 Ethernet port may appear physically similar, but they serve different purposes and are not interchangeable. A serial cable with an RJ-45 connector is typically used for connecting devices like routers or switches through console ports, allowing configuration and management of the devices. On the other hand, an RJ-45 Ethernet port is designed for connecting devices to a local area network (LAN) for data transmission and communication.
In summary, although both the serial cable with an RJ-45 connector and an RJ-45 Ethernet port have the same physical connector type, they serve distinct functions and cannot be used interchangeably.
Learn more about RJ-45 Ethernet: https://brainly.com/question/30457663
#SPJ11
A rain gutter is to be constructed from a metal sheet of width 3m by bending up one-third of the sheet on each side through an angle θ. How should θ be chosen so that the gutter will carry the maximum amount of water?.
The area of the gutter is therefore equal to the area of the rectangle plus the area of the triangles.
A = rectangle + 2 * triangle
= 10h + 2 * (1/2 hw)
Using trig work out h and w.
h = 10 sin ?
w = 10 cos ?
A = 10h + hw
= 100sin? + 100sin?cos?
Differentiate the expression (either use the product rule for sin? cos?, or write 100sin?cos? as 50sin2? using the double angle formula)
A = 100sin? + 50sin2?
dA/dt = 100cos? + 100cos2?
For A to be a max or min the derivative must equal zero
100cos? + 100cos2? = 0
cos? + cos2? = 0
Use the double angle formula to write cos2? as 2cos^2 ? - 1
cos? + 2cos^2 ? - 1 = 0
2cos^2 ? + cos? - 1 = 0
This quadratic factorizes:
(2cos? - 1)(cos? + 1) = 0
This means that
cos ? = 1/2 or cos ? = 1
giving:
? = pi/3 or ? = pi
Which means that to achieve the maximum area ? should be pi/3 = 60 degrees
You can check that this is the max by substituting in these values of theta and the two end points (theta = 0, theta = pi), and seeing that pi/3 gives the maximum.
The maximum area is therefore
A = 100sin? + 100sin?cos?
= 100sin(pi/3) + 100sin(pi/3)cos(pi/3)
= 100 sqrt(3) / 2 + 100 sqrt(3)/2 * 1/2
= 100 * 3/2 * sqrt(3) / 2
= 3 * 25 * sqrt(3)
= 75 sqrt(3)
= 129.9...
= 130 cm^3
You can learn more about this through link below:
https://brainly.com/question/20355154#SPJ4
Find the volume of the rectangular prism
9 cm
10 cm
Answer:
V= 90h cm³ where h is the height of the rectangular prism.
Explanation:
The formula for volume of a rectangular prism is ;
V=l*w*h where;
V=volume in cm³
l= length of prism=10cm
w =width of the prism = 9 cm
Assume the height of the prism as h cm then the volume will be;
V= 10* 9*h
V= 90h cm³
when the value of height of the prism is given, substitute that value with h to get the actual volume of the prism.
Identify how slip affects the strength of a metal
My answer says there is a link but not,there isn’t so here a photo of my answer.
The entire population of a given community is examined, and all who are judged to be free from bowel cancer are questioned extensively about their diets. These people then are followed for several years to see whether their eating habits will predict their risk of developing bowel cancer. Which of the following study designs most appropriately characterizes this situation?
A. Cross-sectional study.
B. Case-control study.
C. Prospective cohort study.
D. Historical prospective cohort study.
E. Clinical trial.
F. Community trial.
Answer:
C) Prospective Cohort study
Explanation:
prospective cohort study can be regarded as longitudinal cohort study that comes up with periods of time when group of individuals that are different in terms of some factors that are undergoing some study, so that how theses factors influence rates of some particular outcomes can be known.
9. An automobile's oxygen sensor output needs
to be checked. Technician A uses a digital
voltmeter to check this sensor's output.
Technician B uses an analog ohmmeter to
check this sensor's output. Who is right?
(A) A only.
(B) B only.
(C) Both A and B.
(D) Neither A nor B.
Answer:
the answer is Letter C
Explanation:
DON'T TRULY TRUST ME PLEASE..
Which of these was not part of the OBD II implementation?
OA. Common Codes
OB. Readiness Monitors
OC. Digital Processing
OD. Standard Terminologies
The Digital Processing is not part of the OBD II implementation.
What is an OBD II system?OBD II is known to be a kind of acronym for On-Board Diagnostic II. This is known to be the second generation of on-board self-diagnostic equipment that is needed for light- and medium-duty California vehicles.
The OBD-II is said to be a kind of on-board computer that handles emissions, , speed, etc.
learn more about OBD II implementation from
https://brainly.com/question/14281435
Suggest suitable materials of construction for the following applications and provide justifications.
a) A 10,000 m' storage tank for toluene.
b) A 5.0 m' tank for storing a 30% w/w aqueous solution of sodium chloride.
c) A 2 m diameter, 20 m high distillation column, distilling acrylonitrile.
d) A 100 m storage tank for strong nitric acid.
e) A 500 m3 aqueous waste hold-up tank. The wastewater pH can vary from 1 to 12. The wastewater will also contain traces of organic material.
f) A packed absorption column 0.5 m diameter, 3 m high, absorbing gaseous hydrochloric acid into water. The column will operate at essentially atmospheric pressure.
Answer:
a) 316 stainless steel
b) 316 stainless steel
c) Carbon steel
d) stainless steel 316
e) stainless steel 316
f ) Carbon steel
Explanation:
A) A 10,000 M' storage tank for Toluene
The best material for building this tank is 316 stainless steel this is because it is relatively cheaper than other materials such as Hest Alloy C while still maintaining the required tensile strength needed to build the storage tank for Toluene
B) A 5.0 m' tank for storing a 30% w/w aqueous solution of sodium chloride
The suitable material for building this tank is 316 stainless steel as it is cheaper than Titanium and Hest Alloy C and it is compatible with sodium chloride
C) A 2 m diameter, 20 m high distillation column, distilling acrylonitrile
The best material for constructing this column is Carbon steel and this is because it has a very high compressive strength which is approximately . 1320 MPa
D) A 100 m storage tank for strong nitric acid.
The best material is stainless steel 316 and this is due to its high tensile strength
E) 316 stainless steel
F) Carbon steel is suitable for building this absorption column because it has a very high compressive strength which is approximately . 1320 MPa
what are the properties of advanced materials?
Sandpaper.
Rubble.
Pyramid.
Wrinkled.
Marbled.
define the term software engineering and list two key reasons that have caused software project successes and failures. how is the software engineering field different than other fields of engineering such as mechanical engineering, electrical engineering, and civil engineering?
Software engineering is the activity of designing, developing, maintaining, testing and evaluating computer software. There are several success factors for software engineering, two of them are: clear objectives and goals and good management.
Software engineering success factorsThese two factors (clear objectives and good management) are very essentials in software engineering. What makes software engineering different from other branches of engineering is that software engineering involves more than one element. It involves design elements, testing, implementation and maintenance elements. So, it is more complex than other branches of engineering. And it also involves hardware and software, because to make a good software you have to know more about the hardware.
Learn more about software engineering https://brainly.com/question/7145033#SPJ4
What are the environmental factors that cause the formation of rust?
Air
A Friction
B )Water
C )Iron Alloys
D )A, B and C
E )A, B, C and D
SP2
Copyright 2021 S/P2. All Rights Reserved.
Answer:
AirWaterIron AlloysExplanation:
Rust is quite simply hydrated Iron oxide because it is as a result of iron allows coming into contact with oxygen(air) and water.
The resulting reaction gives off rust as a product. The chemical reaction is:
4Fe + 3O₂ + 6H₂O → 4Fe(OH)₃.
You can see from above how rust is formed from Iron alloys, Oxygen and water.
As iron is a widely used components in the production of many things such as cars, rust presents a problem because in dissolving away iron, the object produced is compromised and this can lead to serious consequences if left unchecked.
Which of the following best describes the main function of UEFI?
implements the principal of least privilege when assigning permissions
backs up data in the case of a data breach
automatically locks the screen after a specified time of inactivity
manages the boot process
Explanation:
Manages the boot process.
The base of an aluminum block, which is fixed in place, measures 90 cm by 90 cm, and the height of the block is 60 cm. A force, applied to the upper face and parallel to it, produces a shear strain of 0.0060. The shear modulus of aluminum is . What is the displacement of the upper face in the direction of the applied force
The question is incomplete. The complete question is :
The base of an aluminum block, which is fixed in place, measures 90 cm by 90 cm, and the height of the block is 60 cm. A force, applied to the upper face and parallel to it, produces a shear strain of 0.0060. The shear modulus of aluminum is \(3.0 \times 10^{10} \ Pa\) . What is the displacement of the upper face in the direction of the applied force?
Solution :
The relation between shear modulus, shear stress and strain,
\($\text{Shear modulus, S =} \frac{\text{Shear stress}}{\text{shear strain}}$\)
Shear stress = shear modulus (S) x shear strain
\($=3 \times 10^{10} \times 0.0060$\)
\($=1.80 \times 10^8$\) Pa
\($=180 \times 10^6$\) Pa
\($=180 \ MPa$\)
The length represents the distance between the fixed in place portion and where the force is being applied.
Therefore,
\($\text{Displacement} = \text{shear strain} \times \text{length}$\)
= 0.006 x 60 cm
= 0.360 cm
= 3.6 mm
Thus, the displacement of the upper face is 3.6 mm in the direction of the applied force.
A light string can a station- support ary hanging load before of 25.0 kg breaking. An object of mass m = 3.00 kg attached to the string rotates on a friction- less, horizontal table in a circle of radius 0.800 m, and the other end of the T Figure P6.1 string is held fixed as in Figure P6.1. What range of speeds can the object have before the string breaks?
The magnitude of the velocity vector represents the object's current speed.The velocity vector points in the same general direction as the motion of the object.
What speed range is the object capable of before the string snaps?The vector quantity velocity (v), denoted by the equation v = s/t, quantifies displacement (or change in position, s), over change in time (t).
A hanging mass of 25 kg will exert a force of:
25 * 9.81 = 254.25 Newtons on the string
Thus, during rotation, the force exerted should remain less than this. Force on an object in circular motion is given by:
F = (m * v^2) / r
F = mv2/r = 3.0(v2)/0.8 = (25)9.8 = 245
v = sqrt(245 x 0.8 / 3.0) = 8.1 m/s
v is from 0 to 8.1 m/s
Thus, the magnitude of the velocity should not exceed 8.1 meters per second.
To learn more about vector quantity velocity refer
https://brainly.com/question/1846264
#SPJ9
Is 4/8 bigger than 8/12 ?
Is 4/8 bigger than 8/12 ? no
because 4/8 is 1/2 and 8/12 is more than a 1/2
Answer:
4/12 is smaller than 4/8. Get stepwise instruction to compare fractional numbers.
Explanation:
Say you have two fractions, how can you tell which one is larger (or smaller)? If you type your two fractions into the boxes below, this selection will show you how to figure it.
A pair of wires support a heavy painting. tension in the wires is greater when they are
a. vertical
b. the same
c. not vertical
d. none of the above
A pair of wires support a heavy painting. The tension in the wires is greater when they are not vertical.
This is because when the wires are vertical, the weight of the painting is evenly distributed between the two wires, so each wire only needs to support half of the weight. However, when the wires are not vertical, one wire will bear more weight than the other, causing the tension in that wire to increase. This is due to the fact that the weight of the painting creates a force that acts perpendicular to the wires, and the wire that is at a greater angle from the vertical will experience a greater component of this force. Therefore, the tension in the wire that is not vertical will be greater.
learn more about tension in the wires here:
https://brainly.com/question/1625948
#SPJ11
technician a states that liquid coolant is pumped through the engine and flows into the radiator where the heat is transferred to the atmosphere. technician b states that liquid coolant is pumped through the radiator and out into the atmosphere. which technician is correct?
Technician A is correct. Liquid coolant is pumped through the engine to absorb heat and then flows into the radiator. In the radiator, the heat from the coolant is transferred to the atmosphere through the process of convection.
This is facilitated by the radiator's cooling fins, which increase the surface area for heat transfer. The liquid coolant then returns to the engine to absorb more heat and continue the cooling cycle. On the other hand, Technician B is incorrect in stating that liquid coolant is pumped through the radiator and out into the atmosphere.
The radiator is the component where the heat is dissipated, not the final destination of the coolant. It is important to have a properly functioning cooling system to prevent overheating and maintain the engine's optimal temperature.
To know more about radiator visit:
https://brainly.com/question/28822407
#SPJ11
write a python program to get a string which is n (non-negative integer) copies of a given string
Here's a Python program that takes a string and a non-negative integer n as inputs and returns a new string consisting of n copies of the given string:
def get_copies_of_string(string, n):
if n < 0:
return "Invalid input. Please provide a non-negative integer."
return string * n
# Example usage
input_string = input("Enter a string: ")
input_n = int(input("Enter a non-negative integer: "))
result = get_copies_of_string(input_string, input_n)
print("Result:", result)
In this Python program, the get_copies_of_string function takes two parameters: string and n. It checks if n is a non-negative integer. If n is valid, it uses the string repetition operator * to create a new string by multiplying the given string n times. Finally, it returns the resulting string.
A Python program is a set of instructions written in Python syntax that enables a computer to perform specific tasks or solve problems based on the defined logic and algorithms.
You can run this program by providing a string and a non-negative integer when prompted. The program will then output the new string consisting of n copies of the given string.
Learn more about Python programs at:
brainly.com/question/26497128
#SPJ11
What hardware and peripherals are you using right now to take this course? What software and operating system (OS)? Describe the basic details of how the things you write for this course are sent through the internet, including the role of packets, an ISP, and a server.
The hardware that I am using to take this course is a Laptop computer running on windows operating system.
What are the basic details of how the things written for this course are sent through the internet, including the role of packets, an ISP, and a server.When you send a query, like your previous message, your laptop's operating system breaks it into smaller units called packets. These packets contain parts of your message, destination address, and other metadata.
They're sent over the internet through your Internet Service Provider (ISP), which directs them through routers and switches. These network devices ensure packets take the most efficient path.
They reach the server where I'm hosted. The server processes your query, generates a response, divides it into packets, sends them back through the same process, and your laptop reassembles them to display my answer.
Learn more about hardware at:
https://brainly.com/question/24231393
#SPJ3
A process is in control with mean 50 and standard deviation of 2. The upper specification limit for the product being produced is 60 and the lower specification limit is 42. What is the value of Cpk?
Answer:
Cpk = 1.33
Explanation:
Given:
Mean = 50
Sd = 2
USL = 60
LSL = 42
The Cpk means process capability index. it helps decide the specification limit when the nominal value is not the central value of upoer specification limint (USL) and lower specification limit (LSL).
The Cpk can be derived using the formula:
\(Cpk = min [\frac{(usl - mean)}{3 * \sigma}, \frac{(mean - lsl)}{3*\sigma}] \)
\(Cpk = min [\frac{(60 - 50)}{3*2} , \frac{(50 - 42)}{3*2}] \)
Solving further,
\(Cpk = min [\frac{10}{6} , \frac{8}{6}] \)
Cpk = min ( 1.67 , 1.33)
Cpk = 1.33
Cpk = 1.33
Hashmap and interface in java
Q1.
a. Create an interface called FinalLab with attribute dayofexam and a method display() ,
b. Create a class Teacher which implements the Interface with attributes coursename and coursecode. Declare a method details() to print "She teaches BlueJ" (Use constructor to display the b course details). Call the display method to print the dayofexam
c.Create a class Student which extends Teacher with attribute roomnumber. Override the details() and print the course details from teacher class
Q2.
a. Create a class HMapclass and using a Hashmap add 5 countries and their zipcodes. Write a method to print the 3rd city and its Zipcode
b.Create another class AL istclass which extends the HMapclass. In this class declare a ArrayList and add 5 names of universities and print the list using for-each loop
The given Java classes and interfaces demonstrate inheritance through the class "Student" extending the class "Teacher." They also showcase interfaces through the implementation of the "FinalLab" interface by the class "Teacher." Additionally, the use of a Hashmap in the class "HMapclass" and an ArrayList in the class "ArrayListclass" demonstrates the utilization of data structures.
How do the given Java classes and interfaces demonstrate the concepts of inheritance, interfaces, and data structures?Q1.
a. The interface "FinalLab" is created with an attribute "dayofexam" and a method "display()". This interface can be implemented by other classes.
b. The class "Teacher" implements the "FinalLab" interface and has attributes "coursename" and "coursecode". It also has a method "details()" which prints the message "She teaches BlueJ". The constructor is used to display the course details. The display method from the interface is called to print the "dayofexam".
c. The class "Student" extends the "Teacher" class and adds an attribute "roomnumber". It overrides the "details()" method and prints the course details from the "Teacher" class. This means that the "Student" class inherits the attributes and methods from the "Teacher" class and adds its own functionality.
Q2.
a. The class "HMapclass" is created with a Hashmap to store 5 countries and their zipcodes. The method "printThirdCityAndZipcode()" is implemented to print the 3rd city and its zipcode from the Hashmap.
b. The class "ArrayListclass" extends the "HMapclass" and adds an ArrayList to store 5 names of universities. The list is printed using a for-each loop, which iterates over each element of the ArrayList and prints it.
Overall, these exercises demonstrate the use of interfaces, inheritance, and data structures like Hashmap and ArrayList in Java programming. The implementation and overriding of methods showcase the concept of polymorphism and code reusability.
Learn more about interfaces
brainly.com/question/28939355
#SPJ11
In network high availability measurement, what is the meaning of "five nines"? (Choose one answer)
A. Means the network should have 99.999 percent uptime (no more than 5 hours downtime per year)
B. Means the network should have 99.999 percent uptime (no more than 1 hour of downtime per year)
C. Five out of every nine network administrators are always available to take care of network problems
D. Means the network should have 99.999 percent uptime (no more than 5 minutes downtime per year)
An organization is setting up a new data center and requires a precise level of time syncronization; what port is required to be allowed through a firewall to contact an NTP time source? (Choose one answer)
A. TCP port 443
B. TCP port 161
C. UDP port 162
D. UDP port 123
Which of the following are examples of symmetric encryption? (CHOOSE TWO ANSWERS)
A. RSA
B. Triple Data Encryption Standard (3DES)
C. Advanced Encryption Standard (AES)
D. Pretty Good Privacy (PGP)
Which of the following remote access technologies is a Microsoft protocol that allows a user to view and control the desktop of a remote Microsoft Windows computer? (Choose one answer)
A. MS-CHAP
B. ICA
C. RDP
D. PPP
Which of the following remote access security technologies is a UDP-based protocol used to communicate with an AAA server and does not encrypt an entire authentication packet, but only encrypts the password? (Choose one answer)
A. RADIUS
B. CHAP
C. TACACS+
D. Kerberos
The meaning of "five nines" in network high availability measurement is option B: "Means the network should have 99.999 percent uptime (no more than 1 hour of downtime per year)". This is a common term used in the networking industry to indicate a very high level of network uptime.
The port required to be allowed through a firewall to contact an NTP time source is option D: "UDP port 123". This is the default port used by the Network Time Protocol (NTP) for time synchronization.
The examples of symmetric encryption are options B: "Triple Data Encryption Standard (3DES)" and C: "Advanced Encryption Standard (AES)". These are both commonly used symmetric encryption algorithms.
The Microsoft protocol that allows a user to view and control the desktop of a remote Microsoft Windows computer is option C: "RDP". This stands for Remote Desktop Protocol and is a proprietary protocol developed by Microsoft.
The remote access security technology that is a UDP-based protocol used to communicate with an AAA server and does not encrypt an entire authentication packet, but only encrypts the password is option A: "RADIUS". This stands for Remote Authentication Dial-In User Service and is a widely used protocol for remote access authentication.
Learn more about microsoft protocol:
https://brainly.com/question/30135894
#SPJ11
Q1: The meaning of "five nines B. Means the network should have 99.999 percent uptime (no more than 1 hour of downtime per year)
Q2: The port that is required to be allowed through a firewall to contact an NTP time source is D. UDP port 123
Q3: Examples of symmetric encryption are B. Triple Data Encryption Standard (3DES) and C. Advanced Encryption Standard (AES)
Q4: A remote access technology is a Microsoft protocol that allows a user to view and control the desktop of a remote Microsoft Windows computer. is C. RDP
Q5: A remote access security technology that only encrypts the password is B. CHAP
Answer 1: "Five nines" in network high availability measurement means the network should have 99.999 percent uptime. This translates to no more than 1 hour of downtime per year. Achieving this level of uptime requires high levels of redundancy and fault-tolerance in network infrastructure.
Answer 2: The port required to be allowed through a firewall to contact an NTP (Network Time Protocol) time source is UDP port 123. NTP is used for time synchronization of networked devices and is essential for accurate timekeeping in a networked environment.
Answer 3: Symmetric encryption refers to the encryption method in which the same key is used for both encryption and decryption. Examples of symmetric encryption are Triple Data Encryption Standard (3DES) and Advanced Encryption Standard (AES). RSA and Pretty Good Privacy (PGP) are examples of asymmetric encryption where different keys are used for encryption and decryption.
Answer 4: Remote Desktop Protocol (RDP) is a Microsoft protocol that allows a user to view and control the desktop of a remote Microsoft Windows computer. It enables remote access and control of a Windows-based computer from another computer or mobile device.
Answer 5: Challenge-Handshake Authentication Protocol (CHAP) is a remote access security technology that is a UDP-based protocol used to communicate with an AAA (Authentication, Authorization, and Accounting) server. CHAP does not encrypt an entire authentication packet, but only encrypts the password. It is used for mutual authentication between a remote access client and a server, making it more secure than Password Authentication Protocol (PAP).
Learn more about computer networking and security here:https://brainly.com/question/28581015
#SPJ11
a road is anyone who uses the road while a road is the state of the road surface. (True or False)
The given statement is False. A road is not anyone who uses the road while a road is the state of the road surface.What is a road?A road is a path or a way that leads to one place or another. It is used for transportation of people, goods, and services from one place to another.
Roads are generally defined as the ground that is open to the public for use by vehicles, pedestrians, or bicycles.A road is also used to provide accessibility for communities that are otherwise disconnected. Roads can be made of different materials, including gravel, concrete, asphalt, and cobblestone.What is the state of the road surface?The state of the road surface is referred to as the condition or the state of the road. This refers to the wear and tear of the surface, the state of repair, the texture, and the quality of the road markings and signage. It is the condition of the road surface that determines whether or not it is safe to use by drivers, passengers, and pedestrians.A road with potholes and cracks is considered to be in poor condition. It can be hazardous to drive on such roads as they can cause accidents, damage to vehicles and injury to people. In contrast, a road that is in good condition, with smooth, well-maintained surfaces, is considered to be safe and comfortable to use. Hence, the statement given above is false.
To know more about goods, visit:
https://brainly.com/question/29426090
#SPJ11
What parts of ignition system that produce the high voltage?
Modern petrol engines employ ignition coils in all ignition systems for the same fundamental purpose: to produce the high voltage necessary to ignite a spark at the spark plug.
An electric spark is used in a gasoline engine's ignition system to start the fuel-air combination, which burns in the cylinders to create the motive force.
A storage battery, an induction coil, a device to timing high-voltage discharges from the induction coil, a distributor, and a set of spark plugs are the essential parts of the ignition system. The mechanism converts the low voltage electric current from the storage battery, which is typically 12 volts, to high voltage (some 40,000 volts). The distributor sends the high-voltage pulses in succession to each spark plug in the firing order.
To know more about ignition system:
https://brainly.com/question/14094081
#SPJ4