The critical path is the longest duration sequence of activities in a project, with no slack or float. Crashing is a technique used to shorten the project duration by allocating additional resources to critical path activities, considering direct and indirect project costs. Crashing a project involves identifying the critical path, determining crash options, selecting the optimal option, and implementing it by allocating additional resources to critical activities.
a. Two important characteristics of the critical path in a project are:
1. Longest duration: The critical path is the sequence of activities that takes the longest time to complete in a project. It represents the shortest possible time in which the project can be completed, as any delay in the critical path activities will directly impact the project's overall timeline.
2. Zero slack or float: The critical path has no slack or float, meaning that any delay in the critical path activities will cause a delay in the project's completion. Activities on the critical path must be carefully managed to ensure timely completion of the project.
b. Crashing in project management refers to a technique used to shorten the project duration by allocating additional resources to critical path activities. The purpose of crashing is to expedite the project completion while considering the associated costs.
Direct project costs include expenses directly related to the additional resources required for crashing, such as overtime wages or hiring extra workers. Indirect project costs may include penalties for late delivery, lost business opportunities, or additional administrative overhead.
c. To crash a project in four simple steps, follow these guidelines:
1. Identify the critical path: Determine the activities that make up the critical path by analyzing the project network diagram and calculating their durations.
2. Determine crash options: Evaluate different crash options by analyzing the cost and time trade-offs for critical path activities. This involves calculating the cost and time saved by crashing each activity.
3. Select the optimal crash option: Choose the crash option that minimizes the project duration while considering the associated costs. This decision should be based on the available budget and the project's time constraints.
4. Implement the crash option: Allocate additional resources, such as manpower or equipment, to the critical path activities identified in step 1. Monitor and manage these activities closely to ensure the project stays on track.
Learn more about critical path-
brainly.com/question/33129202
#SPJ11
Ally is buying a speed boat for $10,000 with a down payment of $2,500. The bank approved a simple interest flat rate loan for 5 years at 7% APR. How much are the monthly loan payments? (round to the nearest cent) A) $157. 50 B) $168. 75 C) $180. 00 D) $191. 25.
The monthly loan payments for Ally's speed boat amount to $191.25 (option D). This answer is derived from calculating the total loan amount, including interest, and dividing it by the number of months in the loan term.
To calculate the total loan amount, we subtract the down payment of $2,500 from the purchase price of $10,000, resulting in a loan amount of $7,500. The annual interest rate, or APR, is 7%. However, since it's a simple interest flat rate loan, we divide it by the number of compounding periods in a year to obtain the periodic interest rate. In this case, since the loan term is 5 years, there are 5 compounding periods. Therefore, the periodic interest rate is 7% / 5 = 1.4%.
Next, we calculate the total interest by multiplying the loan amount ($7,500) by the periodic interest rate (1.4%) and the loan term in periods (5 years * 5 compounding periods per year = 25 periods). This gives us $7,500 * 1.4% * 25 = $2,625.Finally, we add the total interest ($2,625) to the loan amount ($7,500) to obtain the total repayment amount, which is $10,125. Dividing this total by the number of months in the loan term (5 years * 12 months = 60 months), we find the monthly loan payment to be $10,125 / 60 = $191.25.
Learn more about loan payments click here: brainly.com/question/30743836
#SPJ11
Which phrase best completes the list?
Edit: The correct answer is D
Answer:
The answer is D
Explanation:
because you can't withdrawal money whenever you want that makes long term savings have more interest then savings accounts.
Mario was laid off two months ago. He has not searched for other work because he is expecting to be recalled to work. In the U.S. labor force statistics Mario is counted as
Answer:
Not much information to go off
Explanation:
This is hard to answer since there is no information about the state of the economy. If the economy is doing poor and that is his reason for unemployment, he is cyclically unemployed.
If he is just waiting for his job, he is frictionally unemployed because he is between jobs.
If you are not looking for a specific type of unemployment, he could be classified as not part of the labor force as he is not looking for a job.
A global computer network providing a variety of information and communication facilities, consisting of interconnected networks using standardized communication protocols.
Answer:
The correct answer is "Internet".
Explanation:
A global structure of data networks, the collection of several types of networks throughout which the clients at any device will, whether they have the authorization, obtain some technical information from other devices, recognized as an internet. Which utilizes a fraction of that same cumulative capacity of the already additional infrastructure network systems.Which of the following is true of the Federal Deposit Insurance Corporation?
Responses
It insures bank money
It protects consumers from fraud
It regulates the sale of commodities
It controls the law of car insurance
Deposits are protected by the FDIC; examines and supervises financial institutions for consumer protection and safety; makes it possible to resolve large and complex financial institutions. Option B is true .
How does the FDIC safeguard protected stores?Sadly, banks occasionally fail, but they occasionally fail in a functioning market. The FDIC is working for you when they do. There are numerous causes of bank failure. The chartering authority of the bank takes over in this situation to close the bank and appoint the FDIC as the deposit insurer. On the day of the failure, FDIC personnel are present to identify those who have insured bank funds. If another bank agrees to buy the failing bank, the transition for depositors and borrowers is typically relatively smooth. The FDIC maintains access to the insured funds of depositors even if there is no immediate buyer.
Nearly 3,500 financial institutions are directly examined and supervised by the FDIC. More than half of the banks in the United States are examined by our examiners to determine their operational stability and safety.
To learn more about FDIC visit :
https://brainly.com/question/29340913
#SPJ1
... is an economic system where consumers can choose what to buy and where to buy
A. Planned economic system
B. Mixed economic system
C. Market economic system
D. Tradition economic system
it is C. Market Economic system!
as I read and knew once I found of by reading the sentence you put.
to check out more and I give credits also too for the information https://flexbooks.ck12.org
for confirming it for me. and you can find out more about Economic Systems there for sure also !!
Answer:
it can be either mixed or a market economy
Explanation:
Please help, thank you if you do :)
Answer:
Am I trying to find out C or just simplify ?
Explanation:
7c + 40 + -3c
4c + 40
Item 2
Which of the following is NOT an example of a servant?
A graphic designer in a marketing firm
A manager in a paint store
A chef in a restaurant
A real estate broker who is hired to sell land
A real estate broker hired to sell land does not correspond to an example of a servant, who is a professional assigned to perform functions for the employer.
What are the functions of a broker?They are licensed professionals who have the essential training requirements to provide real estate service, and can work independently or with the hiring of other professionals for the job.
Therefore, the real estate broker is a professional capable of working independently, but must be licensed and comply with the code of ethics of the National Association of Realtors.
Find out more about real estate broker here:
https://brainly.com/question/27205834
#SPJ1
Some HR workers investigate possible company violations. Why is it important for these workers to reserve judgment and be impartial? Explain in your own words. Then, imagine a situation in which someone may NOT reserve judgment and/or may NOT be impartial. Describe that situation.
To ensure a fair and impartial investigation, HR employees investigating potential company violations must reserve judgment and remain impartial.
Why is it critical for these employees to exercise impartiality and reserve judgment?HR professionals can gather all relevant data, facts, and evidence if they are impartial, and then evaluate it without having any preconceived notions or personal biases. They are able to make sound decisions using this strategy rather than relying on their own irrational thoughts or feelings to make decisions.
A situation in which the HR worker conducting the investigation is personally connected to or has a close relationship with the accused party could indicate that the individual may NOT reserve judgment or be impartial.
In such a scenario, the HR employee may feel compelled to safeguard their friend or coworker, which may result in a biased investigation and a result that does not accurately reflect the situation. The HR department's impartiality and integrity could be questioned in this scenario, which would jeopardize the investigation.
Learn more about HR department:
brainly.com/question/29430009
#SPJ1
the type of ownership in which each restaurant is the same in the ownership of each restaurant is the same as known as which of the following?
A. food service cooperation
B. Food service franchise
C. Independent food service operation
D. Food service chain
Answer:
D. Food service chain
Explanation:
In business ownership, a chain of restaurants refers to several restaurants owned by one organization. In other words, in a food service chain, the owner(s) will have many branches located in different locations. Because the restaurant belongs to one entity, they are similar in appearance and operations.
A chain of business is different from a franchise business. In a franchise, the branches are identical but have different owners.
which of the following statements is true about the relationship between business processes and information systems? group of answer choices information systems incorporate all business process activities and hence, should be developed before business processes. the relationship between business processes and information systems is one-to-one. developing information systems before business processes ensures that all activities are considered in the development process. a business process need not relate to any information system, but an information system relates to at least one business process.
A business process need not relate to any information system, but an information system relates to at least one business process, this statements is true about the relationship between business processes and information systems.
A business process is a logically related sequence of actions that specify how particular business tasks are carried out. It is a distinctive method of coordinating work, information, and knowledge inside an organization. Business processes are important for managers to be aware of since they affect how well a firm can conduct its operations and could provide a competitive edge. Each of the main business functions has its own unique business processes, but many of them are cross-functional. Information systems assist firms restructure and streamline business operations by automating certain of these procedures.
The official organizational division in charge of information technology services is the information systems department. It is in charge of maintaining the networks, data storage, hardware, and software that make up the company's IT infrastructure. The department is often led by a CIO and is made up of professionals including programmers, systems analysts, project managers, and information systems managers.
To learn more about information system please click on the given link: https://brainly.com/question/28945047
#SPJ4
What is a contractionary policy?
A central bank's rate of monetary expansion must be reduced or government spending, especially deficit spending, must be reduced as part of a contractionary policy.
The Federal Reserve's three primary methods for reducing the money supply are raising interest rates, raising the minimum reserves required of banks, and selling government securities. Higher interest rates make borrowing money more expensive, which deters customers from purchasing certain goods and services and lowers enterprises' investment in new machinery. In order to prevent inflation, contractionary monetary policy attempts to slow down or even restrict economic growth. It basically slows growth by increasing interest rates and constricting the money supply. Inflation is managed through contractionary policy. When the government cuts tax rates while increasing expenditure to spur economic growth, it is said to be implementing an expansionary fiscal policy. As a result, consumption rises due to an increase in purchasing power. Increasing the raise rates managed and directed by the central bank inside an economy that increases the money supply is known as a contractionary monetary policy.
Learn more about contractionary policy here
https://brainly.com/question/16825778
#SPJ4
which of the following are tools of fiscal policy used to positively stimulate the economy? multiple select question. tax reductions increases in government spending tax increases decreases in government spending a combination of both decreasing government spending and increasing taxes
The tools of fiscal policy used to positively stimulate the economy are: b) Increases in government spending d) Tax reductions.
Increases in government spending can stimulate economic growth by creating jobs and increasing demand for goods and services. Tax reductions can put more money in consumers' pockets, which can lead to increased spending and stimulate economic growth.
On the other hand, tax increases and decreases in government spending can potentially slow down economic growth by reducing the amount of money in circulation and decreasing demand for goods and services. A combination of both decreasing government spending and increasing taxes can also potentially slow down economic growth.
Learn more about fiscal policy
https://brainly.com/question/27250647
#SPJ4
Full Question ;
Which of the following are tools of fiscal policy used to positively stimulate the economy?
a) Tax increases
b) Increases in government spending
c) Decreases in government spending
d) Tax reductions
e) A combination of both decreasing government spending and increasing taxe
luca hicks has a budget that he follows each month. he has used spreadsheet software to help him determine what he wants to spend each month. at the end of the month, the spreadsheet software automatically compares what he budgeted with what he spent. luca can also graph these results if he wants to. what type of budget has luca created?
It typically involves comparing budgeted amounts with actual amounts spent or earned, and analyzing the differences or variances between the two.
In Luca's case, he has used spreadsheet software to create a budget with planned spending for each month. At the end of the month, the software automatically compares the budgeted amounts with the actual amounts spent, allowing Luca to see the variance between the planned and actual spending. Luca can also graph these results for visual representation and analysis. A flexible budget is useful for individuals or businesses that experience fluctuations in income or expenses, as it allows for adjustments to be made based on actual financial performance. It provides flexibility to adapt to changing circumstances and helps in making informed financial decisions.
Learn more about Variance here:
https://brainly.com/question/14116780
#SPJ11
Mia doesn't have any credit history, so she's going to open a secured credit card to begin building her credit. She puts down an $800 security deposit. What feature of an unsecured credit card is Mia's security deposit most like?
the APR
the term
the credit limit
the annual fee
Answer:
i think it will be A OR C
Explanation:
The APR feature of an unsecured credit card is Mia's security deposit most like. If the new card doesn't offer a cheaper annual percentage rate, there is no benefit in transferring his credit card balance from one to the other.
What ways does a secured credit card aid in building credit history?
If you consistently make on-time payments, stay out of late fees, and maintain a low balance on your secured credit card, you might be able to create or improve your credit score. Most secured credit cards will notify the three credit reporting bureaus of your payment activity.
You won't have a credit score if you haven't used credit yet. After you open your first credit line, such as a credit card or student loan, you start to develop your credit score. At that time, how you use that first credit account affects your credit score.
To know more about APR, refer:
brainly.com/question/8846837
#SPJ2
what was the global labour force participation rate for men and for women in 2015?
In 2015, the global labour force participation rate was approximately 76% for men and 49% for women.
The labour force participation rate in 2015 varied by gender on a global scale. For men, the participation rate was around 76%, indicating that approximately three-quarters of men aged 15 and older were part of the labor force. On the other hand, the participation rate for women was approximately 49%, meaning that just under half of women aged 15 and older were actively engaged in the labor force. These figures highlight the existing gender disparities in workforce participation, reflecting socio-cultural and economic factors that influence women's employment opportunities and choices. Efforts to address these disparities aim to promote gender equality and empower women in the labour market.
To know more about employment, click here https://brainly.com/question/17459074
#SPJ11
If you tell me a good counter to this argument fast, I'll give u brainliest + five star (HELP)
If a school duration is not year-round, then students will most likely forget alot of things they learned over school year.
We certainly blank out things over time, and there's no reason to evaluate that what students learn in school should be an exception.
What do you mean by Argument?Making an argument involves two or more individuals reacting to one another's claim and support for such a claim.
There are a few unusual reasons why the brain forgets, but the two main causes are decay and disuse. Decay is a natural process that refers to the gradual loss of information over time. When we first learn something, it is stored in our short-term memory, which is relatively small and can only hold a very small amount of information.
Therefore, The statement “If a school duration is not year-round, then students will most likely forget a lot of things they learned over the school year.” is correct.
Learn more about Argument, here;
https://brainly.com/question/27100677
#SPJ1
Marta is interviewing candidates for a position in the Human Resources department at her company. She is deciding who to interview by going through resumés and looking at the subject areas in which each candidate studied. Which four candidates would be the best choice for Marta to interview?
Answer:
C). Marisol, who studied communications and business
Explanation:
Marisol would be the best candidate to be interviewed for the position in the HR department as she has studies business and communications which is critical to ensure effective communication between the employee and the business. The HR professionals primarily function as the link between the two and help in maintaining healthy employee relations. They act as the leaders in the organization and with their efficient organization, decision-making, and management skills, they ensure the smooth functioning of the organization. Since Marisol has studied business and communications, she must possess these skills which would be the most suitable for the position. Hence, option C is the correct answer.
Answer:
B: Michelle, who studied communications and business
Kay's Bridal Shoppe has 4000 shares of common stock outstanding at a price of $13 a share it also has 500 shares of preferred stock outstanding at a price of $22 a share there are 50 bonds outstanding that have a semi-annual coupon payment of $25 the Bonds mature in 4 years have a face value of $1,000 and salt at 98% of par what is the capital structure weight of the common stock
Answer:
46.43 percent
Explanation:
the capital structure weight of the common stock= Common stock value/
Preferred stock value +Common stock value+debt value
To determine the common stock= price× total shares of common stock
=(4000 shares of common stock × $13 )
=$52000
Preferred stock value= ( 500 shares of preferred stock × outstanding price of $22)=$11000
50 bonds outstanding
We have Bonds which mature in 4 years have a face value of $1,000 and salt at 98% of par , then the
98% of 1000= 98/100 ×1000=$980
Debt incurred= 50 bonds outstanding×$980
=$49000
the capital structure weight of the common stock= Common stock value/
Preferred stock value +Common stock value+debt value
= $52,000/(49000+52,000 + 11000) ×100%
=46.43 percent
With the help of online research, write a short report on “glocalization.”
The phenomena of Glocalization, which is best described as Thinking Globally, Acting Locally, is created when the two terms of globalisation and localization are combined.
To put it more properly, we may say that although if a single brand is produced, sold, and distributed globally, it is nevertheless personalised and customised to suit the tastes and preferences of customers in the many global marketplaces.
It is carried out since each region of the world has its own unique culture, linguistic preferences, demands, and desires.
By adjusting their offerings and products to meet the needs of that specific market, businesses may effectively position and place their items, resulting in high revenues and devoted customers.
The following are all global brands, although they cater to the demands of their customers in various parts of the world while selling items.
Chips by Lays (They sell different flavours in different parts of the world, according to the taste preference and eating habits of that country).
To know more about Glocalization visit:
https://brainly.com/question/14357896
#SPJ9
Most new jobs in the United States will be in the _____.
Answer:
Service-producing industries :)
Explanation:
Question 1
An Object Oriented Programming language is a language that:
O implements overloaded functions
O uses compound data types
O provides features that support object oriented programming
O supports function declarations
Question 2
An object is an entity that:
O returns a compound data type
O contains data and code that manipulates that data
O contains functions
O contains data definitions only
An Object Oriented Programming language is a language that:
Provides features that support object-oriented programming.
An Object Oriented Programming (OOP) language is one that offers features specifically designed to support object-oriented programming principles.
These features include encapsulation, inheritance, polymorphism, and abstraction. OOP languages allow developers to define classes and objects, organize code into reusable modules, and model real-world entities.
Question 2: An object is an entity that:
Answer: Contains data and code that manipulates that data.
An object is a fundamental concept in object-oriented programming. It represents a particular nce of a class and encapsulates both data and the behavior (code) that operates on that data. Objects allow for the organization and manipulation of data by providing methods (functions) to perform operations on the encapsulated data.
Learn more about manipulation here:
https://brainly.com/question/28459068
#SPJ11
which of the following does not affect potential gdp?
The actual level of current output or real GDP does not directly affect potential GDP.
potential GDP, also known as the long-run aggregate supply, is the maximum level of output an economy can produce when all resources are fully utilized. It represents the economy's productive capacity and is determined by factors such as physical capital, human capital, natural resources, and technological progress.
However, the actual level of current output or real GDP does not directly affect potential GDP. Real GDP reflects the actual level of output at a given time, while potential GDP is determined by the availability and efficiency of resources. Changes in real GDP do not impact potential GDP because potential GDP is not influenced by the current level of output.
Learn more:About potential GDP here:
https://brainly.com/question/31571546
#SPJ11
How are business plans used in health care? Check all that apply.
-identifying a consumer market
-establishing goals and objectives
-comparing prices of medical equipment
-calculating a company's cash flow
-figuring out the business's purpose
Answer:
identifying a consumer market
comparing prices of medical equipment
calculating a company's cash flow
Answer:
Establishing goals and objectives
Figuring out the business’s purpose
Explanation:
I got it correct ;)
Post-Assessment
Question 2 of 5
Why is buying a car considered "bad debt"?
It decreases in value over time
It increases your net worth as it build equity
It gives you transportation to and from your job
It is worth more than any other investment
Submit
Continue
E
The reason why buying a car considered "bad debt"is that It decreases in value over time. option A
What is bad debt?The term bad debt can be described as the amount of money that a creditor must write off as a result of a default on the part of the debtor in a case whereby the creditor has a bad debt on the books, then things turn to uncollectible and is recorded as a charge-off.
It should be noted that a case can be regarded as bad debt because the value of the asset you receive from the loan depreciates quickly however in some cases interest charges increase how the amount that is been paid for the vehicle. and in thius case cost is higher compare to what it would be if you'd purchased the car outright with cash.
Hence, option A is correct.
Learn more about bad debt at:
https://brainly.com/question/24871617
#SPJ1
Is Massachusetts has a sales tax of 6 percent and New Hampshire?
If New Hampshire has no sales tax and Massachusetts has a 6% sales tax, purchasing a $1,000 television in New Hampshire will save you $60.
The current state sales tax rate in Massachusetts (MA) is 6.25%. Sales tax is a fee associated with the sale of specific goods and services that is paid to a governing body (local or state). Sales taxes have existed since ancient Egypt, when artwork show the taxation of goods, and were first implemented in the United States in 1921. In 1966, Massachusetts became the first state to enact a general transaction privilege tax. The rate has since increased to 6.25%. You represent the Commonwealth of Massachusetts as a business owner providing taxable goods or services by collecting transaction privilege tax from customers and remitting it to the Department of Revenue. This is a crucial aspect that needs to be emphasised.
learn more about Massachusetts here:
https://brainly.com/question/13960542
#SPJ4
as businesses expand to serve markets, new jobs will be created in service and manufacturing. there will also be more to fill those jobs.
As businesses expand to serve larger markets, people will be needed to fill positions in the service and manufacturing sectors. This will create a large number of new jobs in these areas, which require different skills and knowledge.
In addition, businesses will need to hire more people to handle the increased workload associated with serving a larger market. This will result in a greater need for skilled workers and higher wages to attract the best talent. In addition, businesses will need to invest in new technology and equipment to meet the demands of the larger market, leading to further investment in the local economy. This will create new employment opportunities and create a ripple effect of job growth in various sectors.
To know more about investment click here
https://brainly.com/question/15105766
#SPJ4
Shepherds company. Manufactures two types of shoes sneakers and boots .Each sneakers requires 2 direct labor hours and boots require 1.5 direct labor hours.The overhead rate. Per direct hour is $2 .Direct materials for sneakers and boots is $15-$20 .Respectivelay.The total unit cost for each product.
The question is incomplete. The complete question is :
Shepherd Company manufactures two types of shoes - sneakers and boots. Each sneaker requires 2 direct labor hours and boots require 1.5 direct labor hours. The overhead rate per direct labor hour is $2. Direct materials for sneakers and boots is $15 and $20, respectively. Direct labor for sneakers and boots is $5 and $7, respectively. The total unit cost for each product is:
Solution :
The total unit cost for a product = direct materials cost + direct labor cost + overhead cost
The total unit cost for the sneakers and the boots are :
Particulars Sneakers Boots
Direct material cost $15 $20
Direct labor cost $5 $7
Overhead cost $4 $3
Total unit cost $24 $30
The overhead rate per direct labor hour is $2
So, the overhead cost per unit of :
Sneakers : 2 hours at the rate $2 per hour = $4
Boots : 1.5 hours at the rate of $2 per hour = $3
Hence the answer is : total unit cost = Sneakers: $24; Boots: $30
Suppose, Joe owns a custom decal shop. The Merry Maids maid service company orders seven $100 decals for its company vehicles. Then the maid service breaches the contract after the goods were produced, but before they were delivered. As a result, Joe has a bunch of custom decals for the maid service that he cannot resell. However, by a stroke of luck, a maid service from a nearby city that is also named Merry Maids desires labels for their car. They pay $50 per label for the seven labels that Joe already made. If Joe were to sue for damages, how much could he recover
Answer:
$350
Explanation:
Calculation to determine how much could he recover
Using this formula
Recovering Amount=Amount paid per Label*Numbers of Label already made
Let plug in the formula
Recovering Amount=$50*7
Recovering Amount=$350
Therefore If he were to sue for damages the amount he could recover is $350
your client wants to create a video campaign with your agency. they ask you for an example when you might use the video impressions or video starts metric from campaign manager 360. how do you answer them? select 1 correct responses you're the marketer for a carpet-cleaning service. you've launched a new video ads campaign for them and want to uncover how many people have watched to the midpoint of the video ad. you're a marketing manager for a mobile phone repair company that has rolled out a new marketing campaign featuring video ads. you'd like to know how many people have watched the video ad from start to finish. you're a lighting fixture company owner who's ready to promote a new line of lamps. you're running video ads and want to discover how many people have watched the first quartile of the video ad. your bakery is promoting new baked goods in your inventory. in this campaign, you're featuring video ads and want to see how many impressions your video ads have received.
As the marketer for a carpet-cleaning service, you might use the video starts metric from Campaign Manager 360 to determine how many people have watched to the midpoint of your video ad. This metric specifically tracks the number of viewers who have started watching your video ad.
:1. First, video starts metric measures the number of times your video ad has been started by viewers.
2. Next, emphasize that this metric helps you understand how many people have actually engaged with your video ad and started watching it.
3. Mention that by analyzing the video starts metric, you can determine how successful your campaign has been in grabbing viewers' attention and getting them to watch your ad.
4. Specifically, in the case of your carpet-cleaning service, you can use this metric to uncover how many people have watched to the midpoint of your video ad. This will give you an idea of the audience's level of interest and engagement with your ad.
5. It's important to note that the video starts metric does not provide information about whether viewers completed watching the entire ad or just watched a portion of it. For that, you would need to use other metrics such as video completion rate.
6. Lastly, reassure your client that by monitoring the video starts metric, you can make data-driven decisions to optimize your video ad campaign and improve its effectiveness.
To know more about Service, visit:
brainly.com/question/33952536
#SPJ11