If a project is behind schedule and team members have been absent, earned value calculations will indicate: a) SPI<1.0, CPI 1.0 b) SPI>1.0, CPI < 1.0 c) SPI 1.0, CPI < 1.0 d) SPI > 1.0, CPI > 1.0

Answers

Answer 1

When team members are absent and the project is behind schedule, earned value calculations will indicate a SPI (Schedule Performance Index) less than 1.0 and a CPI (Cost Performance Index) of 1.0. the correct answer is option a).

The Schedule Performance Index (SPI) is calculated by dividing the earned value by the planned value, and if the project is behind schedule, the earned value will be less than the planned value, resulting in an SPI of less than 1.0.

Similarly, the Cost Performance Index (CPI) is calculated by dividing the earned value by the actual cost, and if team members have been absent, the actual cost will likely be higher than the earned value, resulting in a CPI of less than 1.0.

Therefore, the correct answer is option a) SPI < 1.0, CPI < 1.0.

See more about SPI at https://brainly.com/question/30030821.

#SPJ11


Related Questions

Variable costs as a percentage of sales for lemon inc. are 80%, current sales are $600,000, and fixed costs are $130,000. How much will operating income change if sales increase by $40,000?

Answers

When sales increase by $40,000, operating income will change by $-12,000.

By how much would operating income change?

The net operating income is total revenue less direct and indirect expenses. Direct expense is variable cost and indirect expenses are fixed costs.

Operating income = total revenue - variable expenses - fixed costs

Initial operating income: 600,0000 - (0.8 x 600,000) - 130,000 = -10,000

New operating income: (600,000 + 40,000) - [0.8 x (600,000 + 40,000)] - 130,000 = 2,0000

Change in operating income: -10,000 - 2,000 = $-12,000

To learn more about operating income, please check: https://brainly.com/question/26848906

#SPJ1

The______has issued the following requirements: "Refuse, recyclables, and returnables shall be removed from the premises at a frequency that will minimize the development of objectionable odors and other conditions that attract or harbor insects and rodents."
A) USDA
B) FDA
C) OSHA
D) HAACP

Answers

Answer:

its C) OSHA

Explanation:

sorry someone was being annoying as heck and buting in

Answer:

C) OSHA

Explanation: MARK BRAINLIEST PLZZZZZZZZZZZZZZZZzzzzzzzzzzzz

"Refuse, recyclables, and returnables shall be removed from the premises at a frequency that will minimize the development of objectionable odors and other conditions that attract or harbor insects and rodents."

Which of the following alternatives represents the correct amount that must be disclosed as increase (decrease) in trade payables in the cash generated from operations section of the statement of cash flows of Phokwane Limited for the year ended 28 February 2022?
a. 10 400
b. (10 400)
c. (2 500)
d. 10 400
e. 2 500

Answers

The correct answer is e. 2 500.An increase in trade payables of 2 500 should be disclosed as a positive amount (+2 500) in the cash generated from operations

In the cash generated from operations section of the statement of cash flows, an increase in trade payables is considered a source of cash. This is because an increase in trade payables means that the company has received goods or services from suppliers but has not yet paid for them, resulting in a cash inflow.

Therefore, an increase in trade payables of 2 500 should be disclosed as a positive amount (+2 500) in the cash generated from operations section of Phokwane Limited's statement of cash flows for the year ended 28 February 2022.

To know more about cash flow, visit:

https://brainly.com/question/32633657
#SPJ11

when CEO robert nardell took over home depot in 2000, there was central control. store managers acted independently and costs were higher than competitors like lowes. nardell changed the culture to focus on central control and cutting costs. to control costs, store managers were not allowed to choose products for local customers. employees os their customer-focused attitudes, and customer service suffered. to repair this , the next CEO, frank blake , sought to restore the "orange apron" culture. what does this example best illustrate?

Answers

Answer:

corporate culture is chosen by senior management in middle managers and employees have little control over it

Explanation:

I believe this is the answer because based off what it said the employees and managers were not allowed to choose products

a cereal manufacturer wants to know how effective its packaging is in gaining attention. which research method is most appropriate?

Answers

A cereal company is interested in how well its packaging attracts attention. The best research method is direct observation.

Packaging is the best marketing tactic, but why is that?

Appealing and welcoming packaging is crucial for brand awareness. New products on the market must find a way to immediately make an impression and sway consumers' purchasing choices. Statistics show that 70% of consumers base their opinion of a brand only on the packaging of its products.

What kind of research uses direct observation?

a method of data collection when the researcher simply observes or hears the study subjects rather than directly asking any questions or controlling any factors. Direct observation is a useful tool in evaluation studies and field research.

Direct observation, also known as observational study, is a method for gathering evaluation data in which the observer watches the subject in his or her regular environment without altering anything.

Learn more about direct observation: https://brainly.com/question/2419635

#SPJ4

Which of the following types of work would a company be most likely to preform through outsourcing?

A) Long- term work that requires close supervision

B) A consistent, predictable amount of work

C) Important tasks that the company wants control over

D) Specialized work that doesn’t require much supervision

Answers

Answer:

The answer is D.

Explanation:

Got it right on edg

The  following types of work would a company be most likely to preform through outsourcing:  Specialized work that doesn’t require much supervision. Thus option (D) is correct.

What is a company?

A company is a legal entity formed by a group of people, known as shareholders, to conduct business. It is a separate legal entity from its owners, which means that it can enter into contracts, sue or be sued, and own property in its own name.

The primary goal of a company is to generate profits for its owners, but it can also have other objectives such as providing goods and services to customers, creating jobs, and contributing to the community.

The specialized work that doesn’t require much supervision  would a company be most likely to preform through outsourcing. Therefore, option (D) is correct.

Learn more about a company here:

https://brainly.com/question/29733060

#SPJ6

1. If you know that Diane holds the highlighted position in the organizational chart shown here, she is probably a ____ (first-line, top, administrative, middle) manager. A job title associated with that level of management is ________ (plant manager, staff accountant, chief executive officer, coordinator)


2. [CHECK ALL THAT APPLY]

Which of the following activities is most likely part of a typical workday for Diane?
A) Teaching a new employee how to use the company’s workflow management system
B) Reviewing departmental performance to determine whether managers are meeting their goals
C). Assisting customers with general questions about the company’s products
D). Monitoring long-term business trends that may have an impact on the organization
PLS HELPPPPPPPPPPPPP

1. If you know that Diane holds the highlighted position in the organizational chart shown here, she

Answers

1)  If you know that Diane holds the highlighted position in the organizational chart shown here, she is probably a middle manager. A job title associated with that level of management is plant manager.

2) The activities that is most likely part of a typical workday for Diane is "Teaching a new employee how to use the company’s workflow management system" (Option A)

What is an Organizational Chart?

An organizational chart, also known as an organigram, organogram, or organizational breakdown structure, is a diagram that depicts an organization's structure as well as the relationships and relative rankings of its parts and positions/jobs.

Org charts illustrate the structure of an organization and may clearly highlight seniority and lines of authority that should be followed. It can also indicate which roles are in charge of specific duties, divisions, departments, or areas. This can help to eliminate uncertainty and increase communication.

Note that Middle management is the intermediate management level of a hierarchical organization that reports to executive management and is responsible for 'team leading' and/or'specialist' line managers.

Learn more about Middle Management:
https://brainly.com/question/20661176
#SPJ1

The tone a writer takes is referred to as the writing _____.



opinion


perspective


voice


none of the above




ITS NOT PERSPECTIVE

Answers

it should be C. voice!

Price lining is setting a price floor and a price ceiling for a line of products and then setting price points in between to represent differences in quality.A. TrueB. False

Answers

Answer:

FALSE

Explanation:

in the context of information security, confidentiality is essentially the same as privacy. TRUE/FALSE?

Answers

The given statement is False. In the context of information security, confidentiality and privacy are similar but not the same thing. Information confidentiality refers to the requirement that data or information only be accessible to authorized parties who are permitted to access it.

Confidentiality measures are utilized to safeguard against the unlawful sharing of sensitive or private information without the knowledge of the individual to whom it belongs. On the other hand, privacy refers to the right to be left alone and to have control over one's own personal information. The right to privacy ensures that individuals have the ability to safeguard personal information, thoughts, and beliefs from being intruded upon or made public without their consent.

Therefore, confidentiality and privacy are related in that they both refer to the protection of information. However, confidentiality refers to keeping information hidden from others, while privacy refers to the right to control how personal information is shared and used.

For more such questions on Information confidentiality

https://brainly.com/question/14213853

#SPJ11

Please help me don’t write if you don’t know how to solve it

Please help me dont write if you dont know how to solve it

Answers

Answer:

see below

Explanation:

1. Business Revenue

Revenue is the income generated from normal business operations. In this case, normal business operations are selling T-shirts.

The shop sold 25 t-shirts at 70 Dhs each.

Revenue is quantity sold multiplied by sales price

i.e., Revenue = quantity sold x selling price per unit

=70 x 25 Dhs

=1,750 Dhs

2. Business total cost

Costs are the expenses incurred in producing goods intended for sale.

The cost of producing one t-shirt is 15 Dhs.

The cost of producing 70 t-shirts will be.

Total cost = total quantity produced x unit cost

= 70 x 15 Dhs

=1,050 Dhs

3. Business profit

Profit is the income earned from business operation after deducting the cost from the revenues.

I.e., profits = revenue - cost

For this shop

profits = 1,750 Dhs - 1,050 Dhs

Profits = 700 Dhs

When given one variable value, the value of other variables can be easily estimated. This applies to which type of graph? a. Line c. Scale b. Bar d. Both A and B Please select the best answer from the choices provided A B C D

Answers

Answer: A. Line!

Explanation: On Edge!!

The Graves Corporation was incorporated in 2018 and incurred a net op-erating loss of $35,000. The company’s operating income in 2019 was $47,000. Because of a downturn in the local economy, the company suffers a net operating loss of $21,000 in 2020. What is the treatment of the 2020 loss? How would your answer change if Graves were an S corporation?

Answers

Answer:

The 2018 loss was carried forward and decreased the corporation's tax liability during 2019. The 2020 loss should also be carried forward to offset any future gains and reduce future tax liabilities. A company can carry forward a loss indefinitely, since it is allowed to deduct a maximum of 80% of a future year's net income.

If this was an S corporation, it would be pass through entity that is not taxed directly, instead, the owners are taxed. Therefore, this $21,000 loss will be distributed proportionally among all the stockholders, and they must deduct their taxes independently.

under the affordable care act which clasification applies tohealth plans based on amount covered cost

Answers

Under the Affordable Care Act (ACA), health plans are classified based on the amount of covered costs into four categories: Bronze, Silver, Gold, and Platinum.

The Bronze plans typically have the lowest premiums but the highest out-of-pocket costs, with the insurer covering about 60% of the healthcare expenses. Silver plans cover around 70% of the costs, Gold plans cover around 80%, and Platinum plans cover around 90%. These categories help consumers understand the level of coverage they can expect from a particular health plan and make informed decisions based on their healthcare needs and budget. The ACA also provides subsidies and cost-sharing reductions to make insurance more affordable for eligible individuals and families.

Learn more about amount here:

https://brainly.com/question/22661325

#SPJ11

As the technology manager for your firm, you have been tasked with identifying options for cloud-based software and hardware that will be hosted by an external vendor. In addition, the firm wants control over the operating system, underlying applications, and some of the software packages. Based on these specifications, you will be evaluating _____.

Answers

Based on making specifications, on identifying options for cloud-based software and hardware, you will be evaluating Cloud computing.

What is Cloud computing?

Cloud computing serves as the process involving delivering of hosted services over the internet.

Therefore, Cloud computing involves making different services through the Internets, such as data storage.

learn more about Cloud computing at;

https://brainly.com/question/16397886

#SPJ1

if annual demand is 51,031 units, annual holding cost is $22 per unit, and setup cost per order is $199, what is the economic order quantity (eqq)? round your answer to the nearest whole number.

Answers

Rounding the EOQ to the nearest whole number, the economic order quantity (EOQ) is 3,220.

EOQ = √((2 * D * S) / H)

Plugging in the values into the formula:

EOQ = √((2 * 51,031 * 199) / 22)

EOQ ≈ √(228,346,738 / 22)

EOQ ≈ √(10,379,396.27)

EOQ ≈ 3,220.37

EOQ stands for Economic Order Quantity. It is a mathematical formula used in inventory management to determine the optimal order quantity for a product. The objective of EOQ is to minimize the total cost associated with ordering and holding inventory.

The EOQ formula takes into account several factors, including the demand rate, ordering cost, and holding cost. By finding the balance between these costs, a company can identify the quantity that should be ordered to achieve the most cost-effective inventory management. EOQ assumes that demand is constant and known with certainty, there are no quantity discounts, and the lead time for ordering is constant.

To know more about EOQ refer to-

brainly.com/question/30924821

#SPJ4

Sergio needs to reach his supervisor as soon as possible to make a decision about an important client who is threatening to take their business elsewhere if they do not get an immediate response. What is the MOST logical channel of communication for Sergio to use to contact his supervisor and why?

Answers

Answer: The most logical channel of communication for Sergio to use to contact his supervisor would be a phone call or an instant messaging service. This is because phone calls and instant messaging allow for immediate, real-time communication. Sergio needs to reach his supervisor as soon as possible to make a decision about an important client and these two channels of communication allow for the fastest and most direct form of communication. Email or text message may take longer for the supervisor to receive and respond to, which would not be ideal for Sergio's situation.

Explanation:

which statement is true of the debeloping and proposing solutions step in the personal selling process

Answers

The developing and proposing solutions step in the personal selling process involves creating a customized solution to meet the specific needs of the customer.


During this step, the salesperson may present various options or alternatives to the customer and explain the benefits and drawbacks of each one. The salesperson may also negotiate terms and conditions, such as pricing and delivery, to arrive at a mutually satisfactory agreement.


In the personal selling process, the developing and proposing solutions step involves:1. Listening to the customer's needs and concerns carefully. 2. Analyzing those needs and understanding the customer's unique requirements. 3. Creating customized solutions or product offerings that address those needs effectively.

To know more about Personal selling visit:-

https://brainly.com/question/31645153

#SPJ11

What term is commonly used to describe how a company builds and maintaining strong barriers to withstand competitive attacks?.

Answers

A natural next step is a term used to describe how a company builds and maintains strong barriers to withstand competitive attacks.

In the field of business, the natural next step can be described as a part of marketing principle #3. According to this marketing principle, there is a reaction shown by every competitor in a market to its rival.

The natural next step is a strategic plan to overcome rivals in a business by forming trusted and good relations with customers. Strong barriers in the form of enhanced connections with the customers are made so that competitive attacks could be withstood.

To learn more about barriers, click here:

https://brainly.com/question/14277264

#SPJ4

How important is money

Answers

Answer:

very important

Explanation:

money is a global income source for everyone. we all have different types but it is all still money. now say one country got rid of money and had people pay for stuff using other things. if china did that lots of different countries wouldn't be able to get stuff from there unless they had so much of that product they could just give it up.

All else being equal, using a P system would have higher annual holding costs than a Q system. Why does this happen? Check all that apply.A.) P systems need to carry more safety stock than Q systemsB.) P systems have a longer protection interval than Q systemsC.) P systems need higher service levels than Q systemsD.) P systems have higher per-unit holding costs than Q systemsE.) P systems require larger lot sizes than Q systems.

Answers

The statement that using a P system would have higher annual holding costs than a Q system is true, and it is due to several factors. Firstly, P systems need to carry more safety stock than Q systems. Safety stock is the extra stock that a company holds to protect against unexpected demand or supply chain disruptions.

Since P systems order at fixed intervals, they need to keep more safety stock to cover longer periods of time between orders. Secondly, P systems have a longer protection interval than Q systems. Protection interval is the time between placing an order and receiving the inventory. P systems have a longer protection interval, which means that the inventory is held for a longer time, leading to higher holding costs.

Additionally, P systems require higher service levels than Q systems, which means that more stock needs to be held to ensure that customers are satisfied. Finally, P systems have higher per-unit holding costs than Q systems, mainly due to the larger lot sizes that P systems require. All of these factors contribute to higher annual holding costs for P systems compared to Q systems.

To know more about Stock visit :

https://brainly.com/question/29992015

#SPJ11

what is the meaning of interdependance

Answers

Answer: The dependence of two or more people or things on each other.

Explanation: Dictionary

Answer:

There is interdenpendancy with your environment. Example:"living things that cannot make their own food must eat other organisms      for food."When two people or organisms rely on eachother they are interdepentdant. There are three different kinds of interdependency with team work as well.

Explanation:

When organisms rely on eachother that is interdependancy.

When two people need each other equally the people would be described as interdependent.

The organizational theorist James Thompson brought forth these sections of interdependency:

pooled interdependence, the team accomplishes its tasks simply by combining everyone's separate efforts

sequential interdependence, your team members rely on each other in predictable ways for the flow of information, work and decisions.

reciprocal interdependence, your team members are sequentially interdependent, but in addition, work back and forth.

which of the following occurs immediately after the growth stage of the industry life cycle? demand is limited to replacements only and growth is zero. saturation of demand is approached because fewer first-time buyers remain. growth slows because buyers are unfamiliar with the product. social changes, demographics, and international competition cause negative growth. growth is dependent on new entrants to the market, such as population increases.

Answers

Saturation of demand is approached because fewer first-time buyers remain out of the following occurs immediately after the growth stage of the industry life cycle. The correct option is B.

What is also known as the stage of saturation?

Businesses typically experience a sudden halt in revenue development as sales begin to slow. This is known as the stage of saturation. This has an effect on overall growth. In general, businesses at this stage do not require funding, and the brand/product stabilizes in the market stage.

During the product intensity stage, competitors have begun to take a share of the market, and products will not experience sales growth or decline. Typically, this is the point at which the majority of customers are using a product, but there are numerous competitors.

Thus, the ideal selection is option B.

Learn more about the stage of saturation here:

https://brainly.com/question/4134601

#SPJ1

A company must pay a $307,000 settlement in 7 years. (a) What amount must be deposited now at 4% compounded semiannually to have enough money for the settlement? (b) How much interest will be earned? (c) Suppose the company can deposit only $200,000 now. How much more will be needed in 7 years? (d) Suppose the company can deposit $200,000 now in an account that pays interest continuously. What interest rate would they need to accumulate the entire $307,000 in 7 years? (a) The amount that must be deposited is $□. (Do not round until the final answer. Then round to the nearest hundredth as needed.)

Answers

The amount that must be deposited is $274,736.02.The interest earned will be $32,263.98. An additional amount of $32,263.98 will be needed in 7 years.

To calculate the amount that needs to be deposited, we can use the formula for the future value of a present sum with compound interest: FV = PV(1 + r/n)^(nt). In this case, the future value (FV) is $307,000, the interest rate (r) is 4% (or 0.04 as a decimal), the number of compounding periods per year (n) is 2 (semiannually compounded), and the time (t) is 7 years. Plugging in these values and solving for the present value (PV), we find that the amount that must be deposited is $274,736.02.To calculate the interest earned, we subtract the principal amount (PV) from the future value (FV). In this case, the principal amount is $274,736.02 and the future value is $307,000. Therefore, the interest earned is $32,263.98. An additional amount of $32,263.98 will be needed in 7 years.To determine the additional amount needed, we subtract the initial deposit ($200,000) from the future value ($307,000). In this case, the additional amount needed is $32,263.98.

To learn more about interest:

https://brainly.com/question/30393144

#SPJ11

Suppose that Florida Bank has recently granted a loan of $2 million to Oyster Farms at LIBOR plus 0. 5 percent for six months. In return for granting Oyster Farms an interest-rate cap of 6. 5 percent on its loan, this bank has received from this customer a floor rate on the loan of 5 percent. Suppose that, as the loan is about to start, LIBOR declines to 4. 25 percent and remains there for the duration of the loan. How much (in dollars) will Oyster Farms have to pay in total interest on this six-month loan with floor and without floor?How much in interest rebates will Oyster Farms have to pay due to the fall in LIBOR?

Answers

Oyster Farms will have to pay a total interest of $95,000 on the six-month loan without the floor rate, and $100,000 with the floor rate. They will receive an interest rebate of $5,000 due to the fall in LIBOR.

Without the floor rate, Oyster Farms would have to pay interest at a rate of LIBOR plus 0.5 percent, which equals

4.25% + 0.5% = 4.75%.

With a loan amount of $2 million, the total interest payment without the floor rate would be

$2,000,000 * 4.75% = $95,000.

With the floor rate of 5 percent, Oyster Farms would have to pay interest at a rate of 5 percent, regardless of the decline in LIBOR to 4.25 percent. Again, with a loan amount of $2 million, the total interest payment with the floor rate would be

$2,000,000 * 5% = $100,000.

Since LIBOR declined, Oyster Farms will receive an interest rebate due to the fall in LIBOR. The difference between the interest payment without the floor and the interest payment with the floor is

$100,000 - $95,000 = $5,000.

Therefore, Oyster Farms will receive an interest rebate of $5,000.

To know more about interest rebate click here: brainly.com/question/33091656

#SPJ11

What feature of demand curves is explained by the law of diminishing marginal utility.

Answers

Law of diminishing marginal utility explains about the slopes of demand curves.

As the amount of an item with a consumer increases, the marginal value of the goods to him expressed in terms of money declines, and the marginal advantage of utilising each more unit of that product within a given period also declines.

The Idea of declining prices is intimately related to the law of diminishing marginal utility. As a product’s usage rises, its utility declines. As it may turn completely unfavourable to consume another unit of any product, the marginal utility may go below zero and turn into negative utility. Because of this, the initial unit of consumption of any goods is usually the most valuable, and subsequent units of consumption carry decreasing amounts of value.

To learn more about diminishing marginal utility, refer this link.

https://brainly.com/question/13539821

#SPJ4

transition to production refers to the act of moving a product to production from what?

Answers

Transition to production refers to the act of moving a product from the development or testing phase to the production phase.

During the development phase, the product is being designed, tested and refined until it is ready for production. Once the product has been thoroughly tested and meets all requirements, it is then moved into the production phase where it can be manufactured at scale and made available for sale to customers. The transition to production is a critical stage in the product development process as it marks the point at which the product becomes commercially viable.

For further information on Production Phase visit :

https://brainly.com/question/32172983

#SPJ11

the common market evolved into the european community which in turn has been transformed into: european union euro united states of europe four motors of europe

true
false

Answers

True. The Common Market, also known as the European Economic Community, was established in 1957 and later transformed into the European Union (EU) in 1993.

The EU currently consists of 27 member states and has its own currency, the euro, which was introduced in 1999. While the idea of a united states of Europe has been discussed, it has not been formally established. The Four Motors of Europe, on the other hand, refers to a group of four regions in Europe (Baden-Württemberg, Catalonia, Lombardy, and Auvergne-Rhône-Alpes) that collaborate on economic and political issues.

The other terms, United States of Europe and Four Motors of Europe, are not directly related to the transformation of the Common Market into the EU.

To know more about European Union visit-

https://brainly.com/question/12075343

#SPJ11

Victoria is going to invest into an account that pays 9% compounded daily. How much would Victoria need to invest, to the nearest dollar, for the value to account to reach $580 in 6 years? $338.02 $3 $338 $2.64

Answers

Victoria would need to invest $338.02, to the nearest dollar, for the value of the account to reach $580 in 6 years.

To calculate the amount Victoria needs to invest, we can use the compound interest formula: A = P(1 + r/n)^(nt), where A is the future value, P is the principal amount (the amount to be invested), r is the annual interest rate, n is the number of times interest is compounded per year, and t is the number of years. Plugging in the given values, we have 580 = P(1 + 0.09/365)^(365*6). Solving for P, we find P ≈ $338.02.

Therefore, Victoria needs to invest approximately $338.02 for the account value to reach $580 in 6 years.

For more questions like Account click the link below:

https://brainly.com/question/22917325

#SPJ11

Spencer enterprises is attempting to choose among a series of new investment alternatives. The potential investment alternatives, the net present value of the future stream of returns, the capital requirements, and the available capital funds over the next three years are summarized as follows. Capital requirements ($) alternative number alternative net present value ($) year 1 year 2 year 3 1 limited warehouse expansion 3,500 3,000 1,000 4,000 2 extensive warehouse expansion 6,500 2,500 3,500 3,500 3 test market new product 11,000 6,000 4,000 5,000 4 advertising campaign 4,500 2,000 1,500 1,800 5 basic research 7,500 5,000 1,000 4,000 6 purchase new equipment 3,500 1,000 500 900 capital funds available 10,500 7,000 8,750 (a) develop an integer programming model for maximizing the net present value (in $). Let xi = 1 if investment alternative i is selected 0 otherwise for i = 1, 2, 3, 4, 5, 6. Max s. T. Year 1 year 2 year 3 according to this model, what is the maximum net present value (in $)? $ (b) assume that only one of the warehouse expansion projects can be implemented. Modify your model from part (a). In addition to the constraints from part (a), what additional constraint should be added to the integer programming model? according to this model, what is the maximum net present value (in $)? $ (c) suppose that if test marketing of the new product is carried out, the advertising campaign also must be conducted. Modify your formulation from part (b) to reflect this new situation. In addition to the constraints from part (a) and part (b), what additional constraint should be added to the integer programming model? according to this model, what is the maximum net present value (in $)?

Answers

Solving respectively, we get the maximum net present value of a. $21,500, b. $16,500 and c. $14,500.

(a) The objective is to maximize the net present value, which can be represented as:

maximize Z = 3500x1 + 6500x2 + 11000x3 + 4500x4 + 7500x5 + 3500x6

Subject to:

3000x1 + 2500x2 + 6000x3 + 2000x4 + 5000x5 + 1000x6 <= 10500 (Year 1)

1000x1 + 3500x2 + 4000x3 + 1500x4 + 1000x5 + 500x6 <= 7000 (Year 2)

4000x1 + 3500x2 + 5000x3 + 1800x4 + 4000x5 + 900x6 <= 8750 (Year 3)

xi = 0 or 1 for i = 1, 2, 3, 4, 5, 6

The maximum net present value is $21,500.

(b) To ensure that only one warehouse expansion project is implemented, we can add the following constraint:

x1 + x2 <= 1

The modified formulation becomes:

maximize Z = 3500x1 + 6500x2 + 11000x3 + 4500x4 + 7500x5 + 3500x6

Subject to:

3000x1 + 2500x2 + 6000x3 + 2000x4 + 5000x5 + 1000x6 <= 10500 (Year 1)

1000x1 + 3500x2 + 4000x3 + 1500x4 + 1000x5 + 500x6 <= 7000 (Year 2)

4000x1 + 3500x2 + 5000x3 + 1800x4 + 4000x5 + 900x6 <= 8750 (Year 3)

x1 + x2 <= 1

xi = 0 or 1 for i = 1, 2, 3, 4, 5, 6

The maximum net present value is $16,500.

(c) If test marketing of the new product is carried out, the advertising campaign also must be conducted. We can add the following constraint to reflect this:

x3 <= x4

The modified formulation becomes:

maximize Z = 3500x1 + 6500x2 + 11000x3 + 4500x4 + 7500x5 + 3500x6

Subject to:

3000x1 + 2500x2 + 6000x3 + 2000x4 + 5000x5 + 1000x6 <= 10500 (Year 1)

1000x1 + 3500x2 + 4000x3 + 1500x4 + 1000x5 + 500x6 <= 7000 (Year 2)

4000x1 + 3500x2 + 5000x3 + 1800x4 + 4000x5 + 900x6 <= 8750 (Year 3)

x1 + x2 <= 1

x3 <= x4

xi = 0 or 1 for i = 1, 2, 3, 4, 5, 6

The maximum net present value is $14,500.

Learn more about present value at

brainly.com/question/29586738

#SPJ4

Other Questions
Consider a system with one component that is subject to failure, and suppose that we have 120 copies of the component. Suppose further that the lifespan of each copy is an independent exponential random variable with mean 25 days, and that we replace the component with a new copy immediately when it fails.(a) Approximate the probability that the system is still working after 3625 daysProbability(b) Now, suppose that the time to replace the component is a random variable that is uniformly distributed over (0,0.5). Approximate the probability that the system is still working after 4250 days.Probability Bob recently lost his job as a waiter at a local restaurant. A recent increase in the minimum wage keeps local employers from adding more of the low-skill positions for which he qualifies, so he has been unable to find work. He continues to look for a job, but he's considering going back to school for vocational training.Cho just moved with her husband to Portland, Oregon. She's looking for a job as a paralegal.A recent recession has reduced the number of visitors to a local theme park. The park has had to lay off many of its employees, including Ginny.StructuralFrictionalCyclical choose the answer that best demonstrates business writing skills. group of answer choices we created the survey instrument to gather information about the employees' perspective. the survey instrument was created to gather information about the employees' perspective. the survey instrument has been created in order to gather information about the employees' perspective. In the figure below, the vector r_1 points to the location of object 1 and q points to the location of object 2. Both vectors lie in the xy plane. (Express your answers in vector form.) Calculate the position of object 2 relative to object 1, as a relative position vector. r21 = m Calculate the position of object 1 relative to object 2, as a relative position vector. r12 = m is every point of every open set e c r2 a limit point of e? answer the same question for closed sets in r2 according to the textbook we possess several selves, some private and others public. the concepts of face and facework are most directly linked to our ________________self. Suppose that: r = required reserve ratio 0.20 c = {C/D) = currency ratio = 0.45 e = {ER/D) = excess reserve ratio = 0.01 MB = the monetary base = $3,000 billion Given that the formula for the money multiplier is find the value for M, the money supply. The money supply is $ billion. (Round your response to the nearest whole number) Use the money multiplier to find the new value for the money supply if open market operations increase the monetary base by $200 billion The money supply is now $1 billion. (Round your response to the nearest whole number.) Enter your answer in each of the answer boxes. when completing a paper-based prehospital care report, you accidentally write that a laceration was on the left side of a patient's face when it was actually on the right side of the face. correcting this mistake would include which step? Which of the following is a distinguishing characteristic of Fauvism in The Red Room by Henri Matisse?a.) The color shows the sadness that the artist felt about the two World Wars through which he lived.b.)Like all other Fauvist artworks, this painting has one predominant color.c.)The bold colors and simple shapes create a decorative, patterned effect.d.)The painting features the most common Fauve subject, an interior scene of a luxurious home. _____ is the best reinforcement schedule for rapidly teaching a brand new behavior. A coin thrown upward at time t - 0 from the window of a tall office building has a height in feet above the ground t seconds later given by h(t) = -16t^2 + 80t+576= -16 (t-9) (t + 4) What is a database that supports a company's day-to-day operations? Consider that rate of the growth bacteria in the petri dish proportional to the number of the bacteria un the dish.The objective is to model the above application with the differential equation. sugar flakes and cinnamon texas toast both produce similar puffed rice breakfast cereals. for both companies, the cost of producing a box of cereal is 45 cents, and it is not possible for either company to lower their production costs any further. how can one company achieve a competitive advantage over the other? Use the diagram at the right find angle S and angle T Which of the following statements is incorrect? O The cost of debt for a firm is a weighted average of the costs of the different types of equity financing used by the firm. All the answers are correct except one. If the risk of an individual project differs from the average risk of the firm, the firm's overall cost of capital is not the ideal discount rate to use when evaluating that project. It should be noted that the financial analyst should use market values rather than book values to calculate WACC. Finance balance sheets reflect market values. write the equilibrium-constant expression for the given reaction. c(s) 2h2(g)ch4(g)by placing the correct species in the appropriate locations. Cuando el ejrcito de Boabadil perdi ante el ejrcito de Fernando e Isabel, su madre le dijo: "No llores como mujer por lo que no pudiste defender como hombre". Por qu dijo esto? Find the vector v with the given magnitude and the same direction as u.Magnitude: ||v|| = 8Direction: u = -2i need recognition would be greatest in which situation? multiple choice question. pete returned home from work to find that his refrigerator is broken and that his refrigerated and frozen food must be thrown out. don is taking a four-week backpacking trip around europe and wants a new jacket for the trip. claire has run out of chanel no. 5, one of her favorite perfumes. janet is making a fruit salad and has no apples.