To compute the network expected time and Critical Path, you need to perform the Forward Pass, Backward Pass, and Compute Buffers.
These techniques are essential to determine the sequence of activities and their respective durations, as well as identify the Critical Path. The Critical Path is the longest path in the network that determines the minimum time required to complete the project.
To calculate the Critical Path, the Forward Pass and Backward Pass techniques are used to determine the Early Start (ES), Early Finish (EF), Late Start (LS), and Late Finish (LF) for each activity.
Compute Buffers are then used to determine the amount of time that each activity can be delayed without affecting the project's completion time. Compute Slack,
On the other hand, is used to identify how much an activity can be delayed without affecting the early start of the following activity or the project's completion time.
In summary, Forward Pass, Backward Pass, and Compute Buffers are essential techniques to calculate the Critical Path, while Compute Slack helps to identify the flexibility in the project schedule.
To learn more about : network
https://brainly.com/question/28342757
#SPJ11
How does iteration help the engineering design process?
A.
It lets engineers know how to complete their experiments.
B.
It provides proof positive that an engineer’s plan will work.
C.
It encourages engineers to revisit past steps in the process.
D.
It ensures that all ideas or discoveries are communicated clearly.
The way that iteration helps the engineering process is that; C.
It encourages engineers to revisit past steps in the process.
What is the importance of the iteration process?The engineering design process contains a series of steps that helps engineering teams in solving problems.
When we say that design process is iterative, it means that we repeat the steps as many times as required, by making improvements along the way as we learn from previous failure and uncover new design possibilities that help us to arrive at great solutions.
Read more about iteration at; https://brainly.com/question/24793921
What will execute in an if-else conditional statement if the condition evaluates to true?
In an if-else conditional statement, if the condition evaluates to true, the code within the if block will execute.
An if-else conditional statement is used to execute different blocks of code based on the evaluation of a condition. If the condition within the if statement evaluates to true, the code within the corresponding if block will be executed. This allows the program to take a specific action or execute a set of instructions when the condition is met.
If the condition evaluates to false, the code within the else block (if present) will be executed instead. The if-else statement provides a way to implement branching logic and make decisions based on the outcome of a condition.
Learn more about code here:
https://brainly.com/question/31494586
#SPJ11
What line of code would you edit if you wanted a bigger sprite?This is computer science.Pick branliest if right
A.3
B.4
C.5
D.You have to edit the picture itself
Answer:
C. 5
Explanation:
Line 3 refers to the positioning of the sprite.
Line 4 refers to the animation preset of the sprite.
Line 5 is the correct choice because in the code it references scale and a value which can be modified to make the sprite bigger. For example, from 0.3 to 0.5
If I'm right please give brainliest, thanks
A digital animator produces a model of a person jumping on a trampoline. Which measure is a boundary condition of the model?
the designation of zero potential energy as the height of the trampoline
the height of the first jump that the person makes on the trampoline
the velocity of the person as they fall back to the trampoline
the changes that occur in kinetic and potential energy
The designation of zero potential energy as the height of the trampoline is a boundary condition of the model. It involves the minimum potential energy principle.
The minimum potential energy principle is a key concept in different disciplines, including, among others, physics, thermodynamics and chemistry.
This principle states that a structure will deform and/or will change its position to minimize the total potential energy.
The minimum potential energy principle states that the loss of potential energy is due to its dissipation as heat.
Learn more about the potential energy here:
https://brainly.com/question/15126517
cultural changes that occur when one culture comes in contact with another are referred to as select one: a. affiliation. b. acculturation. c. accommodation. d. adaptation.
Answer:
B. Acculturation
Explanation:
I believe that the answer is acculturation or B. since I know that a culture is like the way of doing something somewhere or something that a place does. So I can infer that acculturation would be cultures in contact with one another.
What i the difference between pa-by-value and pa-by-reference in computer programming?
Use pass by value when the parameter is only "used" for a computation and not changed for the client program.
What distinguishes pass by reference from pass by value?Pass by reference refers to a method of sending the function's real parameters, whereas pass by value refers to a method of copying the value of a function parameter to another variable. In light of this, the primary distinction between pass by value and pass by reference is this.
A copy of the address of the real argument is saved when using pass by reference, which is also known as pass by address.
To know more about pass-by-reference visit:-
https://brainly.com/question/23838498
#SPJ4
draw uml diagraminterface I {
\\Some Code
}
abstract class A implements I {
D[] d;
}
class B extends A {
\\Some Code
}
class C extends A {
D d;
class D {
}
The UML diagram for the given code will look like this:
```
+------------+
| <> |
+------------+
^
|
+------------+ +------------+
| A |<>-------| D |
+------------+ +------------+
^ ^
| |
+------------+ +------------+
| B | | C |
+------------+ +------------+
```
In this diagram, the interface I is implemented by the abstract class A, which is then extended by the classes B and C. The abstract class A also has an association with the class D, represented by the diamond symbol. The class C also has an association with the class D, represented by the same symbol. The arrows indicate the direction of the relationship between the classes.
Learn more about programming:
https://brainly.com/question/26134656
#SPJ4
The UML diagram for the given code will look like this:
```
+------------+
| <> |
+------------+
^
|
+------------+ +------------+
| A |<>-------| D |
+------------+ +------------+
^ ^
| |
+------------+ +------------+
| B | | C |
+------------+ +------------+
```
In this diagram, the interface I is implemented by the abstract class A, which is then extended by the classes B and C. The abstract class A also has an association with the class D, represented by the diamond symbol. The class C also has an association with the class D, represented by the same symbol. The arrows indicate the direction of the relationship between the classes.
Learn more about programming:
brainly.com/question/26134656
#SPJ11
which of the following would not transmit signals from one point to another? a. telephone line. b. modem. c. fibre optics. d. coaxial cable
Answer:
b
modem
Explanation:
modem is used to receive signals not transmit
Which Windows utility do you use to access system tools such as Event Viewer and Device Manager?
A. Component services
B. Disk management
C. Mircosoft management console
D. Window services
Computer Management is a tool that you can use to manage a Windows operating system and the computer on which it is running, accessing tools such as Event Viewer and Device Manager.
Impact of incentive programs on digital platforms (Uber/Rappi/Door Dash/Uber Eats/Lyft)
-How to segment users in an incentive program?
Incentive programs play a significant role in shaping user behavior and driving engagement on digital platforms like Uber, Rappi, DoorDash, Uber Eats, and Lyft.
These programs are designed to motivate users to take specific actions or achieve certain goals by offering rewards, discounts, or other incentives.
The impact of incentive programs on digital platforms can be analyzed from multiple perspectives:
1. User Acquisition and Retention: Incentive programs can attract new users to join the platform by offering sign-up bonuses, referral rewards, or first-time user discounts.
These incentives incentivize users to try out the service and increase the platform's user base.
2. User Engagement: Incentive programs can enhance user engagement by encouraging frequent usage of the platform.
3. Behavior Modification: Incentives can be used to shape user behavior in desired ways.
For instance, offering bonuses or higher earnings for drivers during peak hours can encourage them to be more available during busy periods, leading to shorter wait times for customers.
Segmenting users in an incentive program allows the platform to tailor incentives to different user groups based on their behaviors, preferences, or needs.
1. New Users vs. Existing Users: Segmenting users based on their status as new or existing can help design specific incentives to attract new users and retain existing ones.
2. Frequency and Usage Patterns: Segmenting users based on their usage frequency or patterns can enable the platform to incentivize less active users to increase their engagement.
3. Geographic Segmentation: Users in different regions may have varying needs and behaviors. By segmenting users based on their geographic location, platforms can offer location-specific incentives.
4. User Preferences and Behavior: Analyzing user preferences, such as preferred cuisine or ride type, can help segment users for targeted incentives.
Know more about incentives:
https://brainly.com/question/29789606
#SPJ4
Write a program in the if statement that sets the variable hours to 10 when the flag variable minimum is set.
Answer:
I am using normally using conditions it will suit for all programming language
Explanation:
if(minimum){
hours=10
}
7.3 Code Practice edhesive
Answer:
def print_sum(a,b,c):
print(a+b+c)
one = int(input("Enter the 1st number: "))
two = int(input("Enter the 2nd number: "))
three = int(input("Enter the 3rd number: "))
print_sum(one,two,three)
Explanation:
hope this helped :)
Answer:
def print_sum(a,b,c):
print(a+b+c)
one = int(input("Enter the 1st number: "))
two = int(input("Enter the 2nd number: "))
three = int(input("Enter the 3rd number: "))
print_sum(one,two,three)
Explanation:
Hoped this Helped!
Two importance of storage devices
your company hosts its own web server, and it allows consumers to make purchases via the server. the help line has been getting complaints that users are unable to access the secure portion of the website. you open the site and it seems fine, although the secure portion where transactions are completed is inaccessible. what is the most likely cause?
The accident on the company because of the firewall is blocking use TCP IP protocol on port 443. So the customer cannot access because don't have authorization.
What is firewall?A firewall is a network security device that monitors incoming and outgoing network traffic and allows or blocks data packets based on a set of security rules. Its purpose is to establish a barrier between your internal network and traffic coming from outside sources (like the Internet) to block malicious traffic like viruses and hackers. Firewalls can be software or hardware, although it's best to have both. From the case we know that the web server must be setting for the firewall protocol.
Learn more about firewall: https://brainly.com/question/25798879
#SPJ4
is the transport illustrated in the image above active or passive? is the substance moving up or down the concentration gradient?
To identify whether the transport is active or passive and if the substance is moving up or down the concentration gradient, carefully examine the image for any indications of energy usage or the direction of movement relative to the gradient
In the image you provided, it appears that the transport is either active or passive. Active transport requires energy (often in the form of ATP) and moves substances against their concentration gradient, while passive transport does not require energy and moves substances along their concentration gradient. Without the specific image, I cannot conclusively determine the type of transport or the direction of substance movement.
To know more about concentration gradient visit:
brainly.com/question/31239153
#SPJ11
Fill in the blanks to complete the “countdown” function. This function should begin at the “start” variable, which is an integer that is passed to the function, and count down to 0. Complete the code so that a function call like “countdown(2)” will return the numbers “2,1,0”.
Answer:
Check the code down below
Explanation:
You can use this code:
for i in range(5,-1,-1):
print(i)
This will print:
5
4
3
2
1
0
5 is changeable by the way!
The complete the “countdown” function. This function should begin at the “start” variable, which is an integer that is passed to the function, and count down to 0 is in the explanation part.
What is programming?The process of creating a set of instructions that tells a computer how to perform a task is known as programming.
Computer programming languages such as JavaScript, Python, and C++ can be used to create programs.
Here is the code to complete the “countdown” function:
def countdown(start):
for i in range(start, -1, -1):
print(i, end=",")
The countdown function takes an integer start as an argument and counts down from start to 0 using a for loop.
The range function is used to generate an integer sequence from start to 0, with a step size of -1. (i.e., counting backwards).
Thus, each integer in the sequence, separated by commas, is printed using the print function.
For more details regarding programming, visit:
https://brainly.com/question/11023419
#SPJ2
this really isn't a question but it is mainly for Brianly I have 40+ so bainlist answers but on my rank it says I have 0/15 is this a computer bug or what because I've been on this app for a little bit more than a year now
I have a snip to prove how many brainliest answers I have provided below
Answer:
i have it but i have it fixed
Explanation:
might be a visual bug, try refreshing your page. if this doesnt work you can ask someone with a higher rank to help you.
Complete the constructors and the sectorArea method of the Circle class.
public class Circle
{
private double radius;
// constructors
// postcondition: the instance variable is initialized
public Circle(double rad)
{
}
// postcondition: the instance variable is initialized
public Circle(int diameter)
{
}
// postcondition: returns the sector area of a circle with radius equal to
// this circle's radius, according to the formula: (deg / 360) * PI * r^2,
// where deg is the angle in degrees passed as the parameter,
// PI is the value of pi (3.1415...), r is the radius of the circle,
// and "^2" means raised to the second power.
// Use the Math class constant to represent the value of pi.
public double sectorArea(double degree)
{
}
// There may be other instance variables, constructors,
// and methods that are not shown.
}
Answer:
the diameter
Explanation:
is * piI * r^28x 45
explain logic circuit
Computers often chain logic gates together, by taking the output from one gate and using it as the input to another gate. We call that a logic circuit. Circuits enables computers to do more complex operations than they could accomplish with just a single gate. The smallest circuit is a chain of 2 logic gates.
Logic circuits include such devices as multiplexers, registers, arithmetic logic units (ALUs), and computer memory, all the way up through complete microprocessors, which may contain more than 100 million gates. In modern practice, most gates are made from MOSFETs (metal–oxide–semiconductor field-effect transistors).
an attack in which an attacker attempts to lie and misrepresent himself in order to gain access to information that can be useful in an attack is known as:
Social engineering refers to an attack in which the attacker makes an effort to misrepresent and falsely portray oneself in order to obtain information that can be used in the attack.
What is misrepresent ?
A misrepresentation is a false or deceptive statement of fact made by one party to another during negotiations with the intent to induce the other party to enter into a contract. Typically, the misled party has the right to cancel the agreement and, on rare occasions, may even be granted damages (or instead of rescission).
The law for misrepresentation is a hybrid of contract and tort, with common law, equity, and legislation as its main sources. In England and Wales, the Misrepresentation Act of 1967 modified common law. The US and many former British colonies, like India, have followed the broad principle of misrepresentation.
To learn more about misrepresent
https://brainly.com/question/5792449
#SPJ4
HELP NEEDED PLEASE HELP!!!
Answer:
Length Check
Explanation:
Length Check seems to be the most logical answer, with the info given.
Key Vocabulary:
Input - the information computers get from users, devices, or other computers
Output - the information computers give to users, devices, or other computers
Pet Chooser
Try out the pet chooser app a few times to see how it works. What are its inputs and outputs?
Inputs
Outputs
try is input
And which show after opening is output
The pet chooser app takes inputs from users and provides outputs based on those inputs.
Inputs:
1. User preferences: The app asks the user to input their preferences for a pet. This may include factors such as size, activity level, maintenance needs, and temperament. The user selects their preferences from provided options or enters them manually.
2. User location: The app may also ask for the user's location to provide recommendations based on available pets in their area. This helps to narrow down the options to pets that are accessible and feasible for the user.
3. User constraints: The app may inquire about any specific constraints the user has, such as allergies or housing restrictions, to ensure that the recommended pets are suitable for the user's situation.
Outputs:
1. Pet recommendations: Based on the user's inputs, the app generates a list of recommended pets that match the user's preferences and constraints. These recommendations may include different types of pets, such as dogs, cats, birds, or fish.
2. Pet details: For each recommended pet, the app provides details such as breed, age, size, temperament, and care requirements.
3. Additional resources: The app may also provide additional resources, such as links to adoption websites, local animal shelters, or pet care guides.
By considering the user's inputs and generating relevant outputs, the pet chooser app helps users make informed decisions about selecting a pet that aligns with their preferences and constraints.
Learn more about computers here;
https://brainly.com/question/32297640
#SPJ3
How did a users computer connect to aol when it first came out.
Answer:
In February 1991, AOL for DOS was launched using a GeoWorks interface followed a year later by AOL for Windows.
Explanation:
In February 1991, AOL for DOS was launched using a GeoWorks interface followed a year later by AOL for Windows.
Who can use empathetic listening?
counselors
psychiatrists
anyone
teachers
College Readiness
Why can't kites fly well near buildings? (Explain)
Kites are flown high up in the sky and require a considerable amount of space to soar. They require open fields or spaces without obstructions to fly properly. When flying kites near buildings, it disrupts the wind flow, which leads to a less predictable and more turbulent wind flow.
The wind is the most important factor when flying a kite, and tall buildings tend to block or alter the wind's direction and speed.A kite is dependent on wind speed, direction, and flow. When a building blocks the wind, it makes it more difficult for the kite to fly. The turbulent wind around buildings makes it difficult for the kite to maintain the desired height and direction.
Also, when kites fly near buildings, they tend to get caught on the roofs or ledges of buildings. This leads to the kite crashing or getting damaged. Therefore, to fly kites well, there must be a lot of open space with no obstacles to obstruct the wind flow.
To know more about properly visit:
https://brainly.com/question/25808222
#SPJ11
Authentication is concerned with determining _______.
Authentication can be described as the process of determining whether someone or something is, in fact, who or what it says it is. Authentication technology serves us to access control for systems by checking to see if a user's credentials match the credentials in a database of authorized users or in a data authentication server.
There are three basic kind of authentication. The first is knowledge-based — something like a password or PIN code that only the identified user would know. The second is property-based, meaning the user possesses an access card, key, key fob or authorized device unique to them. The third is biologically based.
You can learn more about authentication at https://brainly.com/question/28398310
#SPJ4
You are working on a home office network. Recently, you added a cable modem to the network so the computer named home-pc could connect to the internet. You also added the computer named home-pc2 to your network, but your networking configuration only allows home-pc to connect to the internet. To save on cost, you want to add a hub to the network so that both computers can communicate with each other and connect to the internet. The computers do not need to have guaranteed bandwidth for their network connections
Answer:
connect the ethernet
Explanation:
What variables may be used to track each loop in the program?
There are several variables that can be used to track each loop in a program, depending on the specific use case and the programming language being used. Here are a few examples:
Iteration counter: This is a variable that is incremented each time the loop runs, and is often used to track the number of iterations the loop has completed. This variable can be used to terminate the loop after a certain number of iterations.
Loop variable: This is a variable that is used to iterate through a collection of items, such as an array or a list. The loop variable is typically assigned the next item in the collection each time the loop runs.
Boolean flag: This is a variable that is used to keep track of whether the loop should continue running or not. The flag is set to false when the loop should terminate, and is checked at the beginning of each iteration.
Indicator variable: This is a variable that's used to identify the current state of the loop. This could be a flag that's used to control the loop or could be an index of an array.
Sentinels: This is a special value that when found will cause the loop to terminate.
The specific variables you use to track a loop will depend on the requirements of your program and the logic of the loop.
For example, if you're iterating through an array and need to keep track of the current position in the array, you might use an index variable.
On the other hand, if you're running a loop that continues until a certain condition is met, you might use a Boolean flag or a sentinel value to control the loop.
Learn more about variables:
https://brainly.com/question/12475735
assume eax and ebx contain 75 and 42, respectively. what would be their values after the following instructions:
Assuming that the instructions are not specified, I will provide the possible outcomes based on common instructions used in programming.
If the instructions are to add eax and ebx, the resulting value of eax would be 117 (75+42), while the value of ebx remains at 42. If the instructions are to subtract ebx from eax, the resulting value of eax would be 33 (75-42), while the value of ebx remains at 42.
If the instructions are to multiply eax and ebx, the resulting value of eax would be 3150 (75*42), while the value of ebx remains at 42.
To know more about programming visit:-
https://brainly.com/question/11023419
#SPJ11
What affect does friction have on a machine
Answer:
The friction generates heat, which is an energy that should be converted in movement. That energy, by the form of heat, is a loss.
Decreasing the friction, by lubrication, you will