Two wheelchair ramps, each 10 feet long, lead to the two ends of the entrance porch of Mr. Bell's restaurant. The two ends of the porch are at the same height from the ground, and the start of each ramp is the same distance from the base of the porch. The angle of the first ramp to the ground is 24°.

Answers

Answer 1

Answer:

It must have an angle of exactly 24°.

Step-by-step explanation:

Answer 2

Answer:

It must have an angle of exactly 24°.

Step-by-step explanation:

I got a 100% on my mastery test


Related Questions

PLssssss help me with this question!!

PLssssss help me with this question!!

Answers

Answer: a. equivalent b. not equivalent

c. equivalent d. not equivalent

Step-by-step explanation:

O.5% as a fraction and decimal

Answers

Answer: As a fraction: 1/2

              As a decimal: 0.005

Step-by-step explanation:

FRACTION:

To figure out how to write 0.5% as a fraction, all you need to know is that 0.5 = to a half, or 1/2 because 0.5 is half of 1.

DECIMAL:

0.5% as a decimal form is 0.005 because it is 1000 times less than 1, so you move the 0 3 times right.

Evaluate:
226 (2n + 5) = [?]

Answers

Answer:

n=\frac{x-1130}{452}

Step-by-step explanation:

Answer:

452n + 1130 [I think ] because you distribute the 226 by the inside


"You only spend 29 cents a day for each $500 borrowed" is the part of the problem that tells you about
O A. Interest
OB. Rate of interest
OC. Time constraints
OD. Principal
Click to select your answer.

Answers

Answer:

Principal

Step-by-step explanation:

Given

\(Debt = \$500\)

\(Spent = 29\ cents\)

Required

Determine what the given parameters describe

Literally, the principal amount is the starting amount of anything and as seen in the given parameters, the starting amount is the debt which amounts to $500

Taking the options one after the other;

We can conclude that the given parameters do not talk about Interest, Rate of interest and Time constraint;

Hence, D. Principal answers the question.

The given parameters do not relate to interest

Evaluate the function.
f(x) = -x2-12 find f(-3)

Answers

Your answer to this question is -21

Ali used 2/7 of a foot of ribbon to attach a decoration to his rearview mirror. Now, he has 10/21​ of a foot of ribbon left.

QUESTION: How much ribbon did Ali start with?

Answers

The quantity of ribbon that Ali started with was 16/21 feet, based on the mathematical operation of addition.

What are mathematical operations?

The basic mathematical operations include addition, subtraction, division, and multiplication.

In the addition operation, two or more addends are added to obtain a result called the sum or total using the equation symbol (=) and the addition operand (+).

The quantity of ribbon attached to the rearview mirror = 2/7

The remaining quantity of ribbon after the attachment = 10/21

The quantity of ribbon Ali started with = 16/21 (2/7 + 10/21)

Thus, using the addition operation, we can conclude that Ali started with 16/21 feet of ribbon.

Learn more about mathematical operations at https://brainly.com/question/4721701

#SPJ1

z=x^{2} +y^{2} -4x-2y+9

Answers

Answer:

hello my name Nidhi, please mark me as brainliest bcoz I need it

z=x^{2} +y^{2} -4x-2y+9

"3. Four relationships are given.
Relationship A: x 3 2 1 y 2 2/3 1 2 / 3 2/3 Relationship B: 2x=y
Relationship C: y=2+x
Relationship D: x 3 6 y 6 12 In which two relationships are the constant of proportionality 2?"

"3. Four relationships are given.Relationship A: x 3 2 1 y 2 2/3 1 2 / 3 2/3 Relationship B: 2x=yRelationship

Answers

Answer:

B and D

Step-by-step explanation:

A - check to see IF the relationship is proportional by dividing each y by its associated x:

     2 2/3 ÷ 3 = 8/9

     1 2/3 ÷ 3 = 5/9

     2/3 ÷ 3 = 2/9

none of these match, so not even proportional

B - CoP is the coefficient of x (2)

C - not proportional because of the +2

D - do the same as A

     6/3 = 2

     12/6 = 2

both are the same and equal to 2

Expand & simplify
(x + 3) (x+ 1)

Answers

Using the distributive property (FOIL), multiply x and x to get x^2, x and 1 to get x, 3 and x to get 3x, and 3 and 1 to get 3. Then, you add these terms (x^2 + x + 3x + 3). Simplify like terms to get x^2 + 4x + 3. The final answer is x^2 + 4x + 3.

Give the domain and range of each of the following functions.

Give the domain and range of each of the following functions.

Answers

The domain and range of the functions are attached respectively

What is the domain and range of the functions

The domain of a function is the set of all possible input values (also known as the independent variable) for which the function is defined. The range of a function is the set of all possible output values (also known as the dependent variable) that the function can produce for the given inputs.

a. The domain and range of the function is given as;

domain ; f(x) = (x - 10) / x(9 - x)

domain = (-∞, 0) ∪ (0, 9) ∪ (9, ∞)

range = (-∞, - (11 + 2√10) / 81] ∪ [- (11 - 2√10) / 81, ∞)

b. The domain and range of the function is given as;

domain ; g(x) = x - 4 /√(x² - 9)

domain = (-∞, -3) ∪ (3, ∞)

range = (-∞, 1)

Learn more on domain and range of function here;

https://brainly.com/question/2264373

#SPJ1

Please help! The question is in the image.

Please help! The question is in the image.

Answers

Answer:

Step-by-step explanation:

HELP ME !
A recipe for 24 muffins needs 3 cups of flour. The number of muffins you can make varies directly with the amount of flour.how many muffins Can you make with 5 cups of flour?

Answers

Answer:

40

Step-by-step explanation:

8 muffins=1 cup of flour.

8 muffins × 5 cups = 40

In 5 cups of flour 40 muffins can be made.

What is Unitary Method?

The unitary technique involves first determining the value of a single unit,  followed by the value of the necessary number of units.

For example, Let's say Ram spends 36 Rs. for a dozen (12) bananas.

12 bananas will set you back 36 Rs. 1 banana costs 36 x 12 = 3 Rupees.

As a result, one banana costs three rupees. Let's say we need to calculate the price of 15 bananas.

This may be done as follows: 15 bananas cost 3 rupees each; 15 units cost 45 rupees.

Given:

A recipe for 24 muffins needs 3 cups of flour.

So, in cup of flour the number of muffins can be made

= 24/3

= 8 muffins

and, In 5 cups of flour the number of muffins can be made

= 8 x 5

= 40 muffins

Learn more about Unitary Method here:

https://brainly.com/question/22056199

#SPJ2

the frame of the tent is defined by a rectangular base and two parabolic arches that connect the opposite corners of the base. The graph of y=-0.18x^2+1.6x models the height can a child who is 4 feet tall walk under without bending over

Answers

The child who is 4 feet tall can walk under the tent without bending over, as the height of the tent at that point is greater than 4 feet.

1. Given equation: y = -0.1\(8x^2\) + 1.6x, where y represents the height of the tent and x represents the distance from the center of the tent.

2. We want to find the maximum height of the tent to determine if a 4-foot tall child can walk under it without bending over.

3. To find the maximum height, we need to determine the vertex of the parabolic equation.

4. The vertex of a parabola in the form y = a\(x^2\) + bx + c is given by the formula x = -b / (2a).

5. In our equation, a = -0.18 and b = 1.6. Plugging these values into the formula, we get x = -1.6 / (2 * -0.18).

6. Simplifying the expression, we find x = 4.44.

7. Now, substitute this value back into the equation to find the maximum height: y = -0.18 * (4.4\(4)^2\) + 1.6 * 4.44.

8. Evaluating the expression, we find y ≈ 4.32.

9. The maximum height of the tent is approximately 4.32 feet.

10. Since the child's height is 4 feet, the child can comfortably walk under the tent without bending over, as the height is greater than 4 feet.

11. Therefore, the child who is 4 feet tall can walk under the tent without bending over.

For more such questions on height, click on:

https://brainly.com/question/28990670

#SPJ8

Which function of x has a y-intercept of -5?

Which function of x has a y-intercept of -5?

Answers

Answer:

\(y = - 3x - 5 \\ c = - 5\)

Y=×
Shift left 2 units

Answers

The equation of the shifted line is y = x + 2

How to determine the transformation

From the question, we have the following parameters that can be used in our computation:

y = x

Shift left 2 units

To shift the equation y = x to the left by 2 units, we can replace x with (x + 2) in the equation.

i.e. (x. y) = (x + 2, y)

So, we have the new equation to be y = x + 2

This is the same line as the original equation but shifted 2 units to the left.

Read more about transformation at

https://brainly.com/question/4289712

#SPJ1

A college student earned $6000 during summer vacation working as a waiter in a popular restaurant.The student invested part of the money at 5% and the rest at 10%. If the student received a total of$440 in interest at the end of the year, how much was invested at 5%?

Answers

Answer

$3200

Step-by-step explanation

Variables

• x: amount of money invested at 5%

,

• y: amount of money invested at 10%

The total amount of money invested is $6000, that is,

\(x+y=6000\text{ \lparen eq. 1\rparen}\)

The interest, I, earned for an investment of P dollars at an interest rate of r in t years is calculated as follows:

\(I=Prt\)

where r must be a decimal.

In the case of the amount of money invested at 5%, that is, r = 0.05 (=5/100), after t = 1 year, the interest is:

\(I=x\cdot0.05\cdot1=0.05x\)

In the case of the amount of money invested at 10%, that is, r = 0.1 (=10/100), after t = 1 year, the interest is:

\(I=y\cdot0.1\cdot1=0.1y\)

The student received a total of $440 in interest, then:

\(0.05x+0.1y=440\text{ \lparen eq. 2\rparen}\)

Isolating y from equation 1:

\(\begin{gathered} x+y-x=6000-x \\ y=6000-x\text{ \lparen eq. 3\rparen} \end{gathered}\)

Substituting equation 3 into equation 2 and solving for x:

\(\begin{gathered} 0.05x+0.1(6000-x)=440 \\ 0.05x+0.1\cdot6000-0.1x=440 \\ 600-0.05x=440 \\ 600-0.05x-600=440-600 \\ -0.05x=-160 \\ \frac{-0.05x}{-0.05}=\frac{-160}{-0.05} \\ x=3200 \end{gathered}\)

Calculate how many cups of butter your new recipe will need.

What is 1 and 1/2 cups x 1 and 1/2?

Answers

The answer to your question is 3
1 1/2 x 1 1/2 = 2.25 or 2 1/4

How much will you need to invest at 3% to have earned $900 in interest in 4 years?

Answers

Answer:

You will have earned $113 in interest.

Step-by-step explanation:

After investing for 4 years at 3% interest, your initial investment of $900 will have grown to $1,013.

To find the amount you need to invest, we can use the formula for simple interest:

\(\displaystyle\sf \text{{Interest}} = \text{{Principal}} \times \text{{Rate}} \times \text{{Time}}\)

Here, the principal is the amount you need to invest, the rate is 3% (or 0.03 as a decimal), and the time is 4 years. We can rearrange the formula to solve for the principal:

\(\displaystyle\sf \text{{Principal}} = \frac{{\text{{Interest}}}}{{\text{{Rate}} \times \text{{Time}}}}\)

Plugging in the given values, we get:

\(\displaystyle\sf \text{{Principal}} = \frac{{900}}{{0.03 \times 4}}\)

Simplifying further:

\(\displaystyle\sf \text{{Principal}} = \frac{{900}}{{0.12}}\)

Calculating the division:

\(\displaystyle\sf \text{{Principal}} = 7500\)

Therefore, you will need to invest $7500 at 3% to have earned $900 in interest in 4 years.

Please help ASAP !!!!!!

Please help ASAP !!!!!!

Answers

Answer:

7 or 8

Step-by-step explanation:

7 when each member does at least one of the three,and 8 when some do neither of the three.

A full 17 oz bottle of spring water is leaking half of an ounce a minute into an empty bottle. How long will it take for the two bottles to have the same amount of water

Answers

Answer:

8.5 minutes

Step-by-step explanation:

the bottle will have leaked half into the 2nd bottle, meaning the 2nd bottle has half too

It will take 17 minutes for the two bottles to have the same amount of water.

What is unit rate?

Something calculated for one is called unit rate.

Given that, A full 17 oz bottle of spring water is leaking half of an ounce a minute into an empty bottle.

To have same amount of water both the bottles will have 17/2 = 8.5 ounces of water in them,

Since, it takes a minute to leak or fill half of an ounce,

Therefore, one ounce will take 2 minutes.

Therefore, 8.5 ounces will take = 8.5×2 = 17

Hence, it will take 17 minutes for the two bottles to have the same amount of water.

Learn more about unit rate, click;

https://brainly.com/question/29781084

#SPJ5

At a football game, 35% of people attending were supporting the home team, while 65% were supporting the visiting team. If 455 people attending the game supported the home team, what was the total number of people attending the game?

Answers

Answer:

1300 ppl

Step-by-step explanation:

35%  = .35 in decimal

.35 x =455

x = 455/.35 = 1300 ppl

what is the difference between 7 and 3​

Answers

Answer:

4

Step-by-step explanation:

The difference between the numbers 7 and 3 is 4.

We have,

The given expression is solved by using subtraction.

The expression can be written as:

= 7 - 3

The difference between 7 and 3 is calculated by subtracting the smaller number (3) from the larger number (7):

= 7 - 3

= 4

Therefore,

The difference between the numbers 7 and 3 is 4.

Learn more about expressions here:

https://brainly.com/question/3118662

#SPJ6

What number line shows the approximate location of V5

What number line shows the approximate location of V5

Answers

The number line that shows approximately the location of √5 would the number line in option D.

What is a number line?

A number line is defined as the expression that can be used to illustrate the position of a given number which show either it is a positive or a negative number with one at the middle.

The given value is thus;

= √5 = 2.236067977 = 2.2

From the chosen number line, the dark dot is just few points after 2.

Learn more about number line here:

https://brainly.com/question/24644930

#SPJ1

Can someone answer this

Can someone answer this

Answers

The order of the graphs from largest to lowest correlation coefficients is:

Graph D, Graph A, graph C, graph B.

Which graph has the largest correlation coefficient?

The correlation coefficient between two variables is a coefficient that tells us "how much" these variables relate.

So, in the case for linear correlation, as "more linear" the data appears to be, a large correlation is between the two variables.

With that in mind, we conclude that the order of the graphs (going for larger correlation coefficient to smaller correlation coefficient) is:

Graph D, Graph A, graph C, graph B.

If you want to learn more about correlation:

https://brainly.com/question/4219149

#SPJ1

If Kiri has 28 full-time members this month, how many part-time members does she need, according to your formula?

Answers

She needs 29 full time timber’s

What percentage of 225 is 20

Answers

The Solution:

We are asked to determine the percentage of 20 out of 225.

That is,

\(\frac{20}{225}\times100=\frac{20\times4}{9}=\frac{80}{9}=8.8889\approx8.889\text{\%}\)

Therefore, the correct answer is approximately 8.889%

Further explanation:

20 out of 225 gives the fraction: 20/225

To write this as a percentage, you have to multiply by 100.

\(\frac{20}{225}\times100=8.8889\text{ \%}\)

Determine the measure of the third angle in a triangle when the other two angles total 165 degrees.

Answers

Answer:

15

Step-by-step explanation:

180-15

Hello!

the sum of the angles in the triangle = 180°

so the 3rd angle = 180° - 165° = 15°

The answer is 15°

100 Points! Algebra question. Graph the function. Photo attached. Thank you!

100 Points! Algebra question. Graph the function. Photo attached. Thank you!

Answers

The cost of each pound of grass seed is $6.

A graph of the solution for the cost of each pound of grass seed is shown below.

How to determine the cost of each pound of grass seed?

In order to determine the cost of each pound of grass seed, we would assign a variable to the cost of each pound of grass seed and then translate the word problem into an algebraic linear equation.

Let the variable x represent the cost of each pound of grass seed.

Since Lori bought 3.6 pounds of grass seed and she was charged $22.90, including a tax of $1.30, an algebraic linear equation that best represent this situation is given by;

3.6x + 1.30 = 22.90

3.6x = 22.90 - 1.30

3.6x = 21.60

x = 21.60/3.6

x = $6.

In conclusion, we would sue an online graphing calculator to plot the solution for the cost of each pound of grass seed as shown in the image attached below.

Read more on solution and equation here: brainly.com/question/25858757

#SPJ1

100 Points! Algebra question. Graph the function. Photo attached. Thank you!

1
A line has a slope of 5 and a y-intercept of -2

1A line has a slope of 5 and a y-intercept of -2

Answers

Answer:

1

Step-by-step explanation:

Answer:

(2/5,0)

Step-by-step explanation:

The equation to find a line is mx+b=y. In this case m is 5, and b is -2.

5x+-2=y

Since we want to find the x-intercept, y has to be 0.

So: 5x+-2=0

5x=2

x=2/5

Terry is the school swimming champion and has won several races. If the ratio of the number of times he's won to the number of races he has swum in is 2 : 3, how many races has he won?

Answers

The given information tells us that Terry's wins-to-races ratio is 2:3, but we cannot determine the exact number of races he has won without additional information about the total number of races he has participated in.

If the ratio of the number of times Terry has won to the number of races he has swum in is 2:3, we can set up a proportion to determine the number of races he has won.

Let's denote the number of times Terry has won as x, and the total number of races he has swum in as y. According to the given ratio, we have:

x/y = 2/3

To find the value of x, we need to solve for x when y is known. Since y represents the total number of races, we don't have that information in the given problem. Therefore, we cannot determine the exact number of races Terry has won without knowing the total number of races he has participated in.

The ratio tells us the relationship between the number of wins and the total number of races, but without knowing the denominator (total races), we cannot find a specific value for the numerator (number of wins). We can only determine the ratio between the two quantities.

for similar questions on races.

https://brainly.com/question/24181944

#SPJ8

Other Questions
Can anyone help me please by giving away 10 points A sum of money is shared such that Akintola get twice as much as Adeniyi and Bello gets half of Adeniyi's share. Express these amounts in the form of a proportion. If Bello receives 1200naira, how much do Akkntola and Adeniyi each receive? -1/4 + -3 5/84.5 - 7.77.7 - 6.75.9 - 3.8-0.5 + -7.3(Please answer in order) the human conditions exemplified in Hughes and Chief Seattle's work. due in 2 hours please help me and i really hope you can see it 5. Homologous chromosomes are shown below. Possible crossover points are marked with numbered arrows Mo's age is 4 times his daughter's age today. In 7 years, Mo's age will be only triple his daughter's age. How many years from today will Mo's age be only double his daughter's age? What is the first formal act of the texas house at the beginning of a legislative session?. michael is heavily involved in a special interest group that focuses on cheese policy. which policies do these special interest groups like the most? 4x5 for x=10Please, I really need the answer. The ____________________ tries federal officials who have been impeached. an airplane flies between two points on the ground that are 500 km apart. the destination is directly north of the origination of the flight. the plane flies with an air speed of . if a constant wind blows at 10.0 m/s due west during the flight, what direction must the plane fly relative to north to arrive at the destination? A circle has a diameter of 10 cm. What is the circumference, and what is the area Heinz Company began operations on January 1, 2020, and uses the FIFO method in costing its raw material inventory. Management is contemplating a change to the LIFO method and is interested in determining what effect such a change will have on net income. Accordingly, the following information has been developed:Final Inventory 2017 2018 FIFO $640,000 $712,000LIFO $560,000 $636,000Net Income(computed under the FIFO method) $980,000 $1,030,000Based on the above information, a change to the LIFO method in 2020 would result in net income for 2018 of ________.a. $1,070,000b. $1,030,000c. $954,000d. $950,000 *BRAINLEST* is nitrogen gas an element, compound, homogenous mixture, or a heterogeneous mixture? :))) ples heeeeeeeeeelpppp what is the main goal of environmental policy? describe the tragedy of the commons, and explain why environmental policy would focus on avoiding the tragedy of the commons. On the number line, which point is the closest pi .A.B.C.D. Do you think the Sedition Act is fair or is it too harsh? Why? Would you be willing to give up your freedom of speech in exchange for a guarantee of safety? Why or why not? Mr. cooper graden is 28 feet long and 4 feet wide what is the area of his graden