Write down a work breakdown structure for the task of building a snowman. Assume that you have a team of two, and indicate which activities can be done in parallel. Write a separate list of the tools and parts required.

Answers

Answer 1

1. Gather materials:
  - Snow (enough to form the body, head, and accessories)
  - Carrot (for the nose)
  - Coal or stones (for the eyes, mouth, and buttons)

2. Divide and conquer: Since you have a team of two, you can split the tasks and work in parallel.
 Team Member 1:
  - Build the snowman's body: Roll a large snowball on the ground to form the base.
  - Build the snowman's head: Roll a smaller snowball and place it on top of the body.
  - Attach the carrot nose and coal/stones for eyes, mouth, and buttons.

3. Final touches:
  - Smooth out any rough edges on the snowman's body and head.
  - Adjust the position of the arms, eyes, mouth, and buttons.
Remember to have fun and be creative while building your snowman. Feel free to add any additional accessories or decorations to make it unique and personal.
To know more about materials visit:

https://brainly.com/question/30503992

#SPJ11


Related Questions

A sorting algorithm is used to locate a specific item in a larger collection of data.
True
False

Answers

True. A sorting algorithm is often used to locate a specific item in a large collection of data because it allows the data to be organized in a way that makes it easier to search for a specific item.

In computer science, a sorting algorithm is an algorithm that puts elements of a list into an order. The most frequently used orders are numerical order and lexicographical order, and either ascending or descending. Efficient sorting is important for optimizing the efficiency of other algorithms (such as search and merge algorithms) that require input data to be in sorted lists. Sorting is also often useful for canonicalizing data and for producing human-readable output.

Formally, the output of any sorting algorithm must satisfy two conditions:

The output is in monotonic order (each element is no smaller/larger than the previous element, according to the required order).

The output is a permutation (a reordering, yet retaining all of the original elements) of the input.

For optimum efficiency, the input data should be stored in a data structure which allows random access rather than one that allows only sequential access.

learn more about sorting algorithm here:

https://brainly.com/question/31385166

#SPJ11

by default, the windows server 2012 firewall does not block incoming icmp echo request packets. (true or false)

Answers

False. Incoming ICMP echo request packets, often known as "ping" requests, are typically blocked by the Windows Server 2012 firewall when they come from the Internet or other external networks.

Incoming ICMP echo request packets, or "ping" requests, from the Internet or other external networks are by default blocked by the Windows Server 2012 firewall. It does, however, permit ping queries from devices connected to the same subnet or network. This default configuration aims to protect the server from unneeded network traffic while also adding an extra degree of protection. Although it is not advised from a security perspective, the administrator can configure the firewall to accept inbound ping queries if required.

Learn more about Windows Server here:

https://brainly.com/question/30478285

#SPJ4

what is the difference between entering a formula and entering data​

Answers

Answer:

formula is an expression which calculates the value of a cell. Functions are predefined formulas and are already available in Excel.

The difference between entering a formula and entering data​ is demonstrated by their operations and functions. The function of both of them is very specific and utilize particular aspect.

How do you enter data into a cell?

The entry of data into a cell is facilitated by the given process:

On the worksheet, click a cell. Type the numbers or text that you want to enter, and then press ENTER or TAB. To enter data on a new line within a cell, enter a line break by pressing ALT+ENTER.

There are three types of data that you can enter into a cell. They include data, labels, and formulas. The formula represents a set of calculations with the symbol (fx) in the line above the cell. The answer to these formulas is directly visualized in the cell in the form of data.

Therefore, the difference between entering a formula and entering data​ is demonstrated by their operations and functions.

To learn more about Formulas in Excel, refer to the link:

https://brainly.com/question/29280920

#SPJ2

I need help with this question

I need help with this question

Answers

The DESPILL FACTOR and DESPILL BALANCE sliders are typically used in greenscreening or chroma keying workflows in visual effects or video production software.

What is the sliders affect?

They affect the process of removing color spill or contamination from a greenscreen or chroma key footage, where unwanted color from the greenscreen spills onto the subject or foreground.

DESPILL FACTOR: The DESPILL FACTOR slider controls the strength or intensity of the color spill removal. It determines how much of the unwanted color spill is removed from the foreground or subject. A higher DESPILL FACTOR value will result in more aggressive color spill removal, while a lower value will result in less removal or a more subtle effect.

DESPILL BALANCE: The DESPILL BALANCE slider controls the balance between the colors that are used to replace the removed color spill. It determines how the replacement color is balanced with the original colors in the foreground or subject. A higher DESPILL BALANCE value will result in a more neutral or balanced replacement color, while a lower value may result in a more dominant or noticeable replacement color.

Both the DESPILL FACTOR and DESPILL BALANCE sliders are used in combination to achieve a visually pleasing result in removing color spill and integrating the subject or foreground with the background in a greenscreen or chroma key composite. The optimal settings for these sliders may vary depending on the specific footage, lighting conditions, and desired visual effect, and may require experimentation and adjustment to achieve the desired result.

Read more about sliders affect here:

https://brainly.com/question/4084004

#SPJ1

See text below



Greenscreening Quiz

What do the DESPILL FACTOR and DESPILL BALANCE sliders affect?

B

U

true or false A software license is a legal agreement but it does not control the use and distribution of software.

Answers

A software license is a legal agreement but it does not control the use and distribution of software is True.

They are some of the exclusive rights that the copyright owner has, or the rights that come with copyright ownership. A permission is granted by a license.

What is licensed software?On the other hand, licensed software is exclusive software that is only made available to authorized users through a licensing agreement. As the source code is not intended to be shared with the public for anyone to view or alter, it is the exact opposite of open source.Shareware software is offered for free or at a cheap cost, but in order to use it fully legally, it usually needs to be purchased and registered.Free software that has minimal license and copyright restrictions is known as proprietary software. The distribution disc's most popular apps and files are copied to your computer's hard drive during a custom installation.

To learn more about licensed software refer to:

https://brainly.com/question/29106760

#SPJ1

How do i fix this? ((My computer is on))

How do i fix this? ((My computer is on))

Answers

Answer:

the picture is not clear. there could be many reasons of why this is happening. has your computer had any physical damage recently?

Answer:your computer had a Damage by u get it 101 Battery

and if u want to fix it go to laptop shop and tells him to fix this laptop

Explanation:

What is the IP address of the router in your network where data packets with unknown routes should be forwarded

Answers

Answer:

Everything, that is not reachable via a more special route should be reachable through this route, it will be sent to your router, which (hopefully) knows where to send it (and since your router has ip address 192.168.1.1, it will be sent to that ip address via the interface with ip address 192.168.1.100 of your PC)

Explanation:

What is research? What are the keywords of research? Explain the criteria for a good research.

Answers

Research is a systematic inquiry or study of any subject matter for the purpose of improving one's understanding of it. Research is a form of inquiry, and there are different types of research, including scientific and social research. Research can be conducted using quantitative or qualitative methods.

Keywords of research include hypothesis, literature review, data collection, analysis, and conclusion. Hypotheses are proposed explanations for phenomena that can be tested empirically. Literature review involves the identification and evaluation of relevant literature on the topic under investigation.

Data collection involves gathering information about the phenomenon being studied, while data analysis involves the use of statistical or qualitative techniques to analyze the data. Finally, conclusions are drawn based on the results of the research.

Criteria for good research are as follows:

1. Validity: Refers to the accuracy of the research findings. It is the extent to which a study measures what it is supposed to measure. A good research study should be valid in terms of the research questions being addressed.

2. Reliability: Refers to the consistency of the research findings. A good research study should be reliable in terms of the research questions being addressed.

3. Objectivity: Refers to the impartiality of the research findings. A good research study should be objective in terms of the research questions being addressed.

4. Reproducibility: Refers to the ability of other researchers to replicate the research findings. A good research study should be reproducible by other researchers.

5. Ethical considerations: Refers to the protection of the rights and welfare of the research participants. A good research study should be conducted in an ethical manner.

A good research study should be valid, reliable, objective, reproducible, and conducted in an ethical manner.

To know more about Ethical considerations visit:

https://brainly.com/question/30097387

#SPJ11

Which of these is NOT a safety procedure for lockout/tagout?

A) Inspecting locks and tags for defects

B) Turning off the equipment at the control panel

C) Leaving the equipment on

D) Attaching a safety lock or tag on the energy-isolating device

Answers

Answer:

I would assume c

Explanation:

it just seems like it would not be a safety procedure

Lockout/Tagout would be the idea of properly shutting down a source of energy, draining any surplus energy, and applying mechanisms to that energy source that prevent it from being reactivated, and the further explanation can be defined as follows:

It also called lock & tag is a security method in use in industry and research to guarantee that critical machinery was correctly shut down. It can be restarted until the completion of conservation or recovery operations.

Therefore the final answer is "Option C".

Learn more:

brainly.com/question/10183789

Which of these is NOT a safety procedure for lockout/tagout?A) Inspecting locks and tags for defectsB)

Is it a best practice to restore the DB from Source env of version 10.0.23 (10.0.1037.115) to Target env of Version 10.0.23 (10.0.1037.53)?

Answers

No, it is not a best practice to restore the DB from a source environment of version 10.0.23 (10.0.1037.115) to a target environment of version 10.0.23 (10.0.1037.53) due to differences in build numbers.

When restoring a database from a source environment to a target environment, it is generally recommended to have matching or compatible versions between the two environments. In this case, both the source and target environments have the same major and minor version number (10.0.23), but the build numbers differ (10.0.1037.115 for the source and 10.0.1037.53 for the target). It is ideal to have the exact same version, including the build number, for a seamless and compatible database restore. Differences in build numbers can indicate patches, bug fixes, or updates that may affect the functionality or compatibility of the database.

Learn more about versions here:

https://brainly.com/question/18796371

#SPJ11

Which loop prints the numbers 1, 3, 5, 7, …, 99?\


c = 1

while (c <= 99):
c = c + 2
print(c)

c = 1

while (c < 99):
c = c + 1
print(c)

c = 1

while (c <= 99):
print(c)
c = c + 2

c = 1

while (c < 99):
print(c)
c = c + 1

Answers

The loop that prints the numbers 1, 3, 5, 7, …, 99 is:

The Loop

c = 1

while (c <= 99):

   print(c)

   c = c + 2

This loop initializes the variable c to 1, then enters a while loop that continues as long as c is less than or equal to 99.

During each iteration of the loop, the value of c is printed using the print function, and then c is incremented by 2 using the c = c + 2 statement.

This means that the loop prints out every other odd number between 1 and 99, inclusive.

Read more about loops here:

https://brainly.com/question/19344465

#SPJ1

You can produce evenly spaced floating-point ranges with NumPy’s linspace function. Generate a linear array between 5 and 15 with 10 elements. What is the remainder when you divide the second element by 2? Approximately. a. 0.00 b. 0.11 c. 0.22 d. 0.33 e. 0.44

Answers

You can produce evenly spaced floating-point ranges with NumPy’s linspace function. Generate a linear array between 5 and 15 with 10 elements. The remainder is approximately 0.11. So option b is correct.

To generate a linear array between 5 and 15 with 10 elements using NumPy's linspace function, you can use the following code:

import numpy as np

array = np.linspace(5, 15, 10)

The array generated by this code will be [ 5. 6.11111111 7.22222222 8.33333333 9.44444444 10.55555556 11.66666667 12.77777778 13.88888889 15. ].

To find the remainder when you divide the second element by 2, you can use the modulo operator % in Python:

remainder = array[1] % 2

Calculating the above expression, you will find that the remainder is approximately 0.11.

Therefore,option b is correct.

To learn more about  linear array visit: https://brainly.com/question/24275089

#SPJ11

You start the line with a _____?

Answers

you start a line with a sentence

Before using an advanced filter, you must first set up a(n) ________.
(Microsoft Excel)

A. Structured Range
B. AutoFilter
C. Slicer
D. Criteria Range

Answers

the answer is b autofilter

Does technology make us lazy? Explain. (Remember to support your
answer with citations and references)

Answers

The impact of technology on human laziness is a topic that has been widely debated and it is true to some extent.

Does technology make us lazy?

Some argue it makes us lazy, while others say it can enhance productivity and efficiency.

Argument - technology makes us lazy. Advocates claim tech's conveniences can promote inactivity and a sedentary lifestyle. Tasks once done by hand can now be completed with machines, leading to possible over-reliance on technology and less physical activity, which causes health issues.

Tech improves productivity and efficiency.  Tech revolutionized communication, info access, & task automation, enabling more accomplishment in less time.

Learn more about  technology  from

https://brainly.com/question/7788080

#SPJ1

Sean Cody is a website most known for what?

Answers

Answer:

Sean Cody is a website most known for to translate English to Portuguese.

is an website from the portugués

Please help me to create a c shell . no spam answers please
use the following and requirement specified .
myshell.c
#include
#include
#include
#include
#include
#include
#include
#include
#include
#include
#include "myshell.h"
/*
* Initializes the shell process, in particular its signal handling,
* so that when an keyboard interrupt signal (Ctrl-C) is received by
* the shell, it is instead directed to the process currently running
* in the foreground.
*/
void initialize_signal_handling(void) {
}
/*
* Checks if any background processes have finished, without blocking
* to wait for them. If any processes finished, prints a message for
* each finished process containing the PID of the process.
*/
void print_finished_background_processes(void) {
/* TO BE COMPLETED BY THE STUDENT */
}
/*
* Reads a command line from standard input into a line buffer. If a
* command-line could be read successfully (even if empty), returns a
* positive value. If the reading process is interrupted by a keyboard
* interrupt signal (Ctrl-C), returns 0. If a line cannot be read for
* any other reason, including if an EOF (end-of-file) is detected in
* standard input, exits the program (using the `exit` system call).
*
* The buffer is expected to be at least COMMAND_LINE_MAX_SIZE bytes
* long. If the command line is longer than supported by this buffer
* size (including line-feed character and null termination byte),
* then ignores the full line and returns 0.
*
* If the command-line contains a comment character, any text
* following the comment character is stripped from the command-line.
*
* Parameters:
* - line: pointer pointing to the start of the line buffer.
* Returns:
* - 1 if a line could be read successfully, even if empty. 0 if the
* line could not be read due to a keyboard interrupt or for being
* too long.
*/
int read_command_line(char *line) {
}
/*
* Executes the command (or commands) listed in the specified
* command-line, according to the rules in the assignment
* description. The line may contain no command at all, or may contain
* multiple commands separated by operators like '&', ';' or '|'.
*
* Parameters:
* - line: string corresponding to the command line to be
* executed. This is typically the same line parsed by
* read_command_line, though for testing purposes you must assume
* that this can be any string containing commands in an
* appropriate format.
*/
void run_command_line(char *line) {
}
/* TO BE COMPLETED BY THE STUDENT */
myshell.h
#pragma once
#define COMMAND_LINE_MAX_SIZE 512
void initialize_signal_handling(void);
void print_finished_background_processes(void);
int read_command_line(char *line);
void run_command_line(char *line);
main.c
#include
#include
#include "myshell.h"
int main(void) {
char line[COMMAND_LINE_MAX_SIZE];
// Set up shell process so interrupts are properly directed to called processes
initialize_signal_handling();
while (1) {
// If any background processes finish, print their information
print_finished_background_processes();
// Show prompt, but only if stdin is a terminal
if (isatty(STDIN_FILENO)) printf("> ");
// Read and run a command line
if (read_command_line(line))
run_command_line(line);
}
}

Answers

Creating a C shell: A shell is a program that receives commands and executes them. The command-line interface of Unix-based systems is the shell. It interprets user-entered commands and transmits them to the operating system’s kernel.

Here, you will learn how to create a C shell. Linux and Unix have a variety of different shells. They include the Bourne shell (sh), C shell (csh), and Korn shell (ksh), among others (ksh). The commands you input at the command-line interface are interpreted by these shells. Here is how to create a C shell with different functions:

1. Initialize Signal Handling:

This function initializes the shell process, in particular its signal handling, so that when an interrupt signal is received by the shell, it is directed to the process that is currently running in the foreground.

2. Print Finished Background Processes:

This function checks if any background processes have finished, without blocking to wait for them. If any processes have finished, it prints a message for each finished process containing the PID of the process.

3. Read Command Line:

This function reads a command line from standard input into a line buffer. If a command-line can be read successfully (even if empty), it returns a positive value. If the reading process is interrupted by a keyboard interrupt signal (Ctrl-C), it returns 0. If a line cannot be read for any other reason, including if an EOF (end-of-file) is detected in standard input, it exits the program (using the `exit` system call). The buffer is expected to be at least COMMAND_LINE_MAX_SIZE bytes long.

4. Run Command Line:

This function executes the command (or commands) listed in the specified command-line, according to the rules in the assignment description. The line may contain no command at all, or may contain multiple commands separated by operators like '&', ';' or '|'.myshell.h: This header file contains declarations for the functions initialize_signal_handling, print_finished_background_processes, read_command_line, and run_command_line, as well as a definition for COMMAND_LINE_MAX_SIZE.main.c: This C file includes the main function. This function sets up the shell process so that interrupts are directed to the called processes. It also contains a while loop that prints the prompt and reads and runs a command line. Please note that you should also include the stdlib.h library as it is required for the exit function.

Learn more about C shell

https://brainly.com/question/32567018

#SPJ11

23. Pilihan ganda30 detik1 ptQ. An engineer is assigned the task of reducing the air pollutants being released from a power plant that generates electricity aby burining coal. The engineer performs a variety of computer simulations to determine which techniques and methods would be most effective at reducing air pollution generated by the plant.The air pollutant that computer simulations would likely show as being the most reduced by the installation of baghouse filters in exhaust systemsPilihan jawabansulfur dioxidecarbon dioxidecarbon monoxideparticulate matter

Answers

The air pollutant that computer simulations would likely show as being the most reduced by the installation of baghouse filters in exhaust systems  is Particulate matter.

PM, or particulate matter, refers to a mixture of solid and liquid droplets that are prevalent in the air. It is also known as particle pollution. Dust, dirt, soot, and smoke are a few examples of particles that can be seen with the unaided eye because they are large or dark. A microscope's electron beam is the only way to see some others because they are so tiny.

Particle pollution consists of two types of fine inhalable particles, PM2.5 and PM10, both of which have dimensions of approximately 2.5 micrometers and below. PM10 particles have an average diameter of 10 micrometers.

Just how little is 2.5 micrometers? Just one hair on your head comes to mind. The average human hair has a diameter of roughly 70 micrometers, which is 30 times greater than the greatest tiny particle.

learn more about Particulate matter here:

https://brainly.com/question/15230454

#SPJ4

Atomic integers in Linux are useful when A) several variables are involved in a race condition. B) a single process access several variable involved in a race condition. C) an integer variable needs to be updated. D) All of the above.

Answers

Atomic integers in Linux are useful when  an integer variable needs to be updated.

What is an Atomic Integer?

This is known to be an applications that is said to be a form of an atomically incremented counters, and it is one which cannot be used as a kind of replacement for any Integer.

Therefore, Atomic integers in Linux are useful when  an integer variable needs to be updated.

Learn more about Atomic integers from

https://brainly.com/question/20515314

#SPJ1

Rewrite getPrecedence method using java HashMap so that it produces the same output. You MUST include appropriate program comments and formatting including:1) Your first and last name2) Your student ID3) The date4) A short description of the program’s function5) Comments necessary to explain the operation of your program6) Proper indentationTip: You may use getOrDefault

Answers

A mapping function can be provided to the computeIfPresent method, which will then be used to calculate a new value based on an existing one. Examples include MapString, Integer> words = new HashMap>(); words. put("hello", 3); words.

Only if the key has already been associated with a value may the replace(K key, V value) function of the Map interface, which is implemented by the HashMap class, be used to change the value of the supplied key. Parameters: It takes two parameters for this method: which is the element's key, and whose value has to be changed, key. The value mapped by a specific key specified in the parameter is retrieved using the get() function of the HashMap class. If there is no such mapping for the key in the map, it returns NULL.

Learn more about functions on:

brainly.com/question/1267517

#SPJ4

My Dell tablet was not opening...... what was wrong with it??? What can i do now.... How it can be repaired? Please Telll

Answers

Answer:

it is stuck if its stuck just long press on the power button

Explanation:

Perform a hard reset

Disconnect the AC adapter or power cord, and remove the battery (for Dell laptop PCs). ... Press and hold the power button for 15-20 seconds to drain residual power. Connect the AC adapter or power cord and the battery (for Dell laptop PCs)

if it is stuck just hold onto the power button for acouple of seconds

In flowcharts, what symbol with along with arrows is used to represent a loop?


A. circle

B. diamond

C. rectangle

D. hexagon

Answers

The correct symbol used to represent a loop in flowcharts is a circle.

A circle with an arrow pointing back to the start of the loop is commonly used to indicate a repetitive process in the flowchart. This circle is also known as a "looping construct" or a "looping statement". It is often used in programming languages like C++, Java, and Python to repeat a section of code until a certain condition is met. The circle symbol is placed at the beginning and end of the loop, with an arrow connecting the two circles to show the repetition. The explanation is that loops are an essential part of flowcharts as they help to simplify complex processes and make them easier to understand and follow.

Learn more about flowcharts: https://brainly.com/question/20815809

#SPJ11

At the center of a star network is the _____, which manages the network and acts as a communications conduit for all network traffic.

Answers

Answer:

switch

Explanation:

At the center of a star network is the _____, which manages the network and acts as a communications conduit for all network traffic.

a. scale b. log c. portal d. switch

A:

d. switch

When creating a multipage website what are the two most important things to
remember?

A. Link your style sheet to each page and add an H1
B. Link your style sheet to each page and link all pages together
C. Link your style sheet to each page and add images
D. Link your style sheet to each page and style all elements

Answers

Answer:

B. Link your style sheet to each page and link all pages together

Explanation:

A. Link your style sheet to each page and add an H1

Not needed. Multipage websites don't require H1s to function

B. Link your style sheet to each page and link all pages together

Correct. Pages should be linked together so the website can be navigable.

C. Link your style sheet to each page and add images

Not needed. Multipage websites don't require images to function.

D. Link your style sheet to each page and style all elements

Not needed. You don't need to style every element.

Software that enables information to be obtained from a computer without the user's knowledge is ____________

Answers

Answer:

Spyware

Explanation:

Decomposition is
O a list of steps to complete a task.
O a set of steps that follow one another in order.
O breaking a problem into smaller parts
O a design flaw in the program.

Answers

Answer:

breaking a problem into smaller parts

Explanation:

In language of computer science, decomposition is the process in which complex problems are divided into simpler parts. These simpler parts helps in the solving of the complex problems. They are made easier and comprehensible for the user to understand. Each simple part is further analyzed separately and the solution of the complex issues are derived.  The process becomes lengthy but the solution is found.

italic, bold, bold italic, and underline are examples of _____.

Answers

Answer:

Examples of typographical emphasis.

TRY IT Choose the Right Technology MP3 player Widescreen laptop computer Smartphone Tablet computer with wireless Internet Suppose your parents are planning to take you and your younger brother on a tour of several European countries. You are in charge of choosing a device for your family's vacation that will allow you to look up where to eat, what to see, and what to do. You will need something that you, your parents, and your younger brother can use. The device needs to accommodate your dad's large hands and your mother's request that it fit in her handbag, which is about half the size of a backpack O Digital camera Audio recorder DONE Which one of the following devices would you choose to meet those requirements?​

Answers

the answer is:

d. tablet computer with wireless internet.

1. How do we know if the information in a websites is fake or not?


2. How important is respect for truth?

Answers

Answer: 1)Ingrese la URL del sitio web y podrá ver detalles como el nombre de la organización del propietario, el país de registro y la antigüedad del dominio
2)Como individuos, ser veraces significa que podemos crecer y madurar, aprendiendo de nuestros errores

Explanation:

when a workbook is protected, users cannot insert, delete, or rename worksheets.truefalse

Answers

The given statement "when a workbook is protected, users cannot insert, delete, or rename worksheets" is true.

In addition to restricting actions on worksheets, workbook protection can also prevent users from editing cells, formatting cells, and even viewing hidden sheets. It is an important security feature that ensures the integrity and confidentiality of the data contained in the workbook. To protect a workbook in Microsoft Excel, you can go to the Review tab and click on the Protect Workbook button. This will bring up a dialog box where you can choose which actions you want to restrict. You can also set a password to prevent unauthorized users from modifying the protection settings or removing the protection altogether. It is important to note that workbook protection is not foolproof, and there are ways to bypass it. However, it does provide a basic level of security that can deter casual users from making unwanted changes to the workbook.

For more such questions on modifying

https://brainly.com/question/21772907

#SPJ11

Other Questions
What were the first 3 consumer luxury products produced during the Antebellum? At what breath alcohol level would a boater be considered ""under the influence"" in florida?. Pleseee help me pretty please The volume of oxygen consumed (in liters per minute) while a person is at rest and while he orshe is exercising (running on a treadmill) was measured for each of 50 subjects. The goal is todetermine if the volume of oxygen consumed during aerobic exercise can be estimated from theamount consumed at rest. The results are plotted below.In this study, the response variable isA) the volume of oxygen consumed at rest.B) the volume of oxygen consumed while running.C) the volume consumed at rest or while running. It doesn't matter which isconsidered the response.D) the measuring instrument used to measure the volume consumed. The perimeter of a rectangular lawn i 50 meter. It' 16 meter long how wide i it? the ? is a cross-connect facility used for the termination and connection of outlet cables, dd cords, equipment cords, and in some cases, ado cables. which of the following amino acid residues would not provide a side chain for acid-base catalysis at physiological ph? (assume pk values of each amino acid are equal to the pk value for the free amino acid in solution.) i. leucine ii. lysine iii. aspartic acid iv. histidine a) i, ii, iii b) i, ii c) i d) ii e) i, iii A single marble tile measures 25 cm by 20 cm. How many tiles will be required to cover a floor with dimensions 2 meters by 3 meters?A. 320 tilesB. 240 tilesC. 180 tilesD. 120 tiles(Please do step by step and the answer) A country is at the full-employment (i.e., zero cyclical unemployment) level. Suppose the treasury tries to reduce unemployment below the natural rate of unemployment by a one-shot increase in government purchases (i.e., the G-increase occurs once only). Assume that such policy change would not affect the publics inflation expectations. Explain whether the above policy can reduce the unemployment rate in the short run and in the long run. Write a thematic statement for The Medicine Bag: To correct myopia (nearsightedness) requires ___________ lenses; to correct hyperopia (farsightedness) requires _____________ lenses to correct. Solve 2log 12 (-8x)=6 2. JK, KL, and LJ are all tangent to circle O. The diagram is not drawn to scale. (1 point)LBKIf JA = 12, AL = 15, and CK=5, what is the perimeter of AJKL? Kasey spent $46.20 on 12 gallons of gasoline. What was the price of 1 gallon of gasoline? Which statement best illustrates an example of economic specialization? 18+45-9(2)Using order of operations Look at the coordinate plan below. Among these points, circle the points where x < y (the first coordinate, x, is smaller than the second coordinate, y.PLS HELP! WILL DO BRAINLIST!!!! the sandy beach inn is located on the oregon coast and caters to an upscale clientele, offering such services as in-room massage, wedding packages, and catered beach picnics. after the rooms have been cleaned each day, all linens and towels are sent out for professional laundering. under activity-based costing, the cost of laundry service is a(n) activity. The following points are the vertices of a triangle: (0, 1), (4, 5), (4, 1), Write a system of linear inequalities that represents the points inside the triangle in python, the variable in the for clause is referred to as the _____ because it is the target of an assignment at the beginning of each loop iteration.